1, determine the installation position installation location need to avoid houses, trees and other obstructions in the shadows, avoid reduce the efficiency of the solar panel, led to the work time is short. If in the northern hemisphere, install the 'integration of solar street lights' direction as far as possible make solar
1, determine the installation position of the scene to avoid the shadow of houses, trees and other obstacles, so as not to reduce the efficiency of the solar panels, work time is short. If in the northern hemisphere, the installation direction 'integrated solar street lights,' as far as possible to make solar panels toward the south or receives the good direction, to achieve maximum energy. If it is in the southern hemisphere, when installation to make solar panels toward the north or the smooth toward a better direction. According to the actual project needs, choose the best installation location, along the road to install solar street light. 2. Mining base size according to the requirement of excavation, foundation construction, first of all should follow the local laws and regulations requirements, geological survey, if the surface is soft soil, the excavation depth should be deepened. Curing 2-3, pouring street lamp base Four days later, on to the next step. In the process of concrete curing, should be regularly water curing, after being completely curing of concrete, before being installed. 4. Install street lamp 1) Demolition of packing and check the attachment; 2) Connect external waterproof connector, test lamp whether can work normally; 3) Tighten the back seat of the lamp to the appropriate height of the lamp; 4) After installation, please clean up the dirt on the surface of the solar panels in time, be careful not to have the object shelter solar panels solar integrated the advantages of street lamp. 5, complete the installation, maintenance regularly to ensure that is beautiful and better able to receive solar battery, the battery pack in the dirt, leaves, or other impurities can be cleaned once every six months. In severe dust or regional conditions, maintenance frequency can be shorten appropriately. The above is about integrated solar street light assembly process. Solar integration street lamp is a solar panel, led lights, and the combination of lithium battery. Through the intelligent human body induction system, with low energy consumption, high time consumption, the characteristics of the Gao Liuming and free maintenance. At the same time, the integrated solar street light is easy to install and transport.