loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Why when double deck glass components installed on the roof of the building

Double glass no metal frame components, its working temperature was lower than those of conventional components will be 2 ~ 5 degrees Celsius, high capacity 1% ~ 2%, the reason is that the conventional components of aluminum alloy frame for internal air convection. No border, convection can significantly enhance, cause component

double deck glass components without metal frame, its working temperature is lower than conventional component 2 ~ 5 degrees, high capacity 1% ~ 2%, because of air convection in the frame of the conventional components of aluminum alloy is unfavorable. No boundary, convection will be significantly enhanced, led to the decrease of the component temperature. When the distance between the components and roof installation is very close, less convection, so the double deck glass component is more suitable for installation on the roof of the tilt, in this case, the temperature drop is more obvious. For example, if someone stepped on the double deck glass component on the cell itself is curved, but the degree of the cell itself has not changed. Therefore, cell under tensile and compression strength, especially in the process of stretching, cell is easy to produce the gravity. This is the same as the causes in the technical cooperation period. In addition, during the period of temperature control, power attenuation will be smaller. Temperature coefficient on behalf of the thermal expansion and contraction, temperature cycle, the material will also expand and contract. For symmetric structure mechanics, will have little impact on the battery. We double glass components for the aging test in the laboratory, including high temperature and high humidity, hot and cold cycle, PID and ultraviolet light. 2 times the international electrotechnical commission standard test conditions, uv may be six times. After the experiment, double deck glass components of power attenuation value of 2%, especially the PID, basic is less than 1%. According to test results, double deck glass components of power guarantee period of 30 years, starting from the second year, the annual power attenuation is not more than 0. The power of 5%, compared with conventional components guarantee period of 25 years and 0 respectively. 7%. In general, the double glass components has many advantages, and the market prospect is very broad.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service