loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Why high lamp of actual light pole size for qu county solar road

Light, each section inserting depth just can control in 50 centimeters? The answer is yes, I can't control. Light, from production to installation need to face a lot of influence assembly link, such as roll bar, school mouth, hot dip galvanized, welding, transportation and so on, these links

every day high lamp insertion depth can precise control in 50 centimeters? The answer is yes, really can't control. From production to installation, light, need to face many links affecting assembly size, such as roll bar, alignment, hot dip galvanized, welding, transportation, etc. These connections are more or less affect the final insertion depth, that is, when the design drawings before production, insertion depth is designed to 50 cm, when the actual installation is complete, the insert depth may be to 40 cm or 70 cm, it is entirely possible. It is also a customer misunderstanding of the main causes of high lamp manufacturers. When many customers check and accept high lamp, measuring size does not accord with the drawings. The phenomenon in more than 30 meters high lamp stand out, because more than 30 meters high lamp by at least three to four parts. For four parts, there will be three insertion point four parts. If each insertion point error is 40 centimeters ( Some even higher) 。 Then three parts add up to 1. 2 meters, the final height lower than this drawing requirements. However, users might mistakenly think that manufacturers have to cut corners, this is actually caused by the large insert error, lead to insert too deep.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service