Once upon a time the government call villages have village-to-village project, the so-called village-to-village project is for the villages were built by cement, let farmers friends convenient travel a lot, and village-to-village project roads, don't have to farmers for all friends. In coverage
once upon a time the government call villages have village-to-village project, the so-called coverage & throughout; Project is for the villages were built by cement, let farmers friends convenient travel a lot, and coverage & throughout; Projects to build roads, need not farmers money minded friends. In the coverage & throughout; Engineering after the end of the village, village came into light & throughout; Engineering, that is, the village lighting engineering, equipment is to give the village street, let farmers friends at night can also convenient, but the complete coverage throughout light &; Engineering, engineering for several years later, why farmer friends happy not up, beginning complaints increased? Inductive analysis there are two primary reasons.
the first reason, planning life of street lamp specifications ( Simple bad)
there are a lot of coverage in the villages throughout light &; Engineering, equipment, the way the light is not how long it is not bright, let's think first is due to the quality of the solar street lights, so on the road, after a period of time is broken, did not play to it should play the role of, so the farmer friends also not happy, very upset.
as to why the quality is unqualified, because there are many, the direct reason is that there are some bad factories use poor quality material to produce, lead to can not meet the program specification. Direct reason is that some of the middlemen in order to obtain high in the middle of the price difference, and then to the manufacturers have far lower prices, as the saying goes, a price points a points goods, most of the factory is not own brand, what business is still want to do it, but sometimes the price is too low, lead to can't living, only to cut corners, it is because of this vicious competition is the way the light is damaged after a period of time!
the second reason, after-sales service is not perfect, Bad nobody fix)
equipment of road lights, it didn't take long breaks down, someone repair is good ah, but villages have no professional repair personnel, will not take this kind of lamps, so street lamp broken, did not get timely repair, broken is not bright, it is not bright, with no equipment is a pose, so farmers friends not happy, very upset.
now can implement to the street lamp damage after arrived at the scene repair within 48 hled solar street lamps factory is not much, so let's grab from fountainhead, the company products' quality this aspect to guard a pass strictly, ensure each went out of the factory's products are qualified. Do demand after sales, repair of the late chance is greatly decreased, disguised also save our time and artificial cost, why not do it!