What to do before and after high lamp installation work

- -

high lamp outside everywhere in daily life, its atmospheric modelling, light range, a comprehensive light, night light for us. So you know what need to do before and after installation high lamp? Small make up to introduce the next high lamp installation process before and after work.

high lamp height from the m - M range, using polygon light pole, usually/while/edge, and pin pull rod inserting type structure. Among the common m, m, m height of the product on the light pole diameter, diameter, under the light pole section, the section on the wall thickness of the section of wall thickness is different, specific according to the need to carry on the design, the height of the different collocation of different caliber, and in the light, the light pole are basically use of hot dip galvanized coating processing. Often apply to city square, station, port, airport, parking lot, stadium, overpass etc.

a, light, preparation work before installation:

carefully before installation according to the loading and packing list to check all the components are complete. Check the component parts for damage phenomenon such as broken, bent, and twisted. If there is a timely replacement parts. It can be said to be very important, if you have any quality problems found after the installation is completed, whether to replace or repair will become very complicated. Therefore, before installation will clear these inspections can be get twice the result with half the effort. Each section on the rod body signs will indicate the type of the rod body, the order number and the number of segments. If there are no matching will terminate the work in time for replacement, or check back up is very troublesome.

2, high lamp installation work

every joining together to provide the length and size of the socket, but because the installation will produce the error or due to reasons such as the effect of physical factors. In order to make the installation fast and convenient, may need to use to the lubrication. Note cannot be used lubricating oil to prevent leakage and pollution, rod body with soap and water can be interior and exterior surface of the socket. To exert on the two end socket suitable force, in order to obtain close the socket. In this process, in addition to pay attention to the installation time is closely connected to ensure their own safety, security, after all, is the top priority we all construction.

3, high lamp installed after the check:

high lamp installed after check carefully, on power check switch, see whether can work normally, when the screw to install in place, if there is any loose, and so on. If please welcome to replace, it would be in time, to found a mistake as long as to timely correction, makes the high lamp still play its good performance.

all in all, light, convenient in our life also has its complexity, all these work well when installed, can foster strengths and circumvent weaknesses to the greatest extent.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service