What need to do commissioning work before installing solar lights

- -

to ensure the use of solar energy lamp late, before the installation, need some functions of street lamp for debugging, especially solar energy controller, control function debugging good, solar lamp basic need not bother to subsequent operations.

a, control function set when debugging

according to the requirements of the design, set up the lights on time every day, and press the controller manual instruction set time control node, a night light on time should be no more than set value, can only be equal to or less than the set value, otherwise it will affect the lighting and reduce the service life.

2, electric function simulation

if after wiring in the daytime, can be used not pervious to light shade battery components to meet smooth ( Or unload the controller battery components connection) , according to the mentioned on the manual controller delay time, look after the corresponding time, solar energy light source can automatically.

can light the instructions relating to the function is normal, not lighten the instructions relating to the function failure, need to check the controller Settings. If the normal, remove the solar battery components obstructions ( Or the controller battery components on the power cord connected) , light source can be put out automatically, the electric off function normally.

do solar street lamps controller after debugging, and then before the solar lamp installed hoisting, for lithium batteries and other equipment to conduct a simple test to see if the light source can be lit. Avoid discovered light isn't on the overall installation is complete, then maintenance is a waste of time and increase the cost.

in addition, the solar accessories inside the lamp plug thing to tight, stuck, avoid the wind swing is loose and poor contact and breakdowns, reliable solar energy lamps and lanterns and light pole, light pole and cantilever fixed. Only in this way can guarantee the performance of the equipment complete.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service