What is the daily maintenance of solar street lamps?

1) Solar panels: assembly good street lamps, or 3 months once every six months to clean. Cleaning process to meet the smooth surface with cloth to wipe clean, the available water. It is strictly prohibited in the backlight surface water to clean solar panels from bottom to top. Solar panels weeks

1) Solar panel:

good street lamp assembly, or 3 months once every six months to clean. Cleaning process to meet the smooth surface with cloth to wipe clean, the available water. It is strictly prohibited in the backlight surface water to clean solar panels from bottom to top. Solar panels can't there are tall trees around, or blocking solar threatening the sunlight absorption buildings.

2) Lamps and lanterns of lamps and lanterns:

glass cover with cloth to wipe clean, the available water. It is forbidden to use high-pressure water gun to clean lamps and lanterns.

3) Valve control type sealed maintenance-free lead-acid battery:

this is a maintenance free batteries. Use of general need for battery during rehydration and other maintenance. Every 12 months for a nominal voltage detection, if the deviation is too big need to supplement. Maintenance-free lead-acid battery or replacement. Lead-acid battery terminals need anti-oxidation processing make butter.

4) Light pole:

appearance surface have to take off the lacquer phenomenon is found, please antirust processing in a timely manner. If you have serious deformation phenomenon, it is forbidden to continue to use.

5) Solar panel bracket to connect to the light pole:

solar panels stents with light pole have to take off the lacquer phenomenon is found, please antirust processing in a timely manner. In the case of any changes of solar panel bracket light of attack Angle, please adjust. If you have to take off the lacquer surface, please antirust processing in a timely manner. Adjust to south direction when solar panels.

6) Screw fasteners:

check all screw fasteners and connection screw, antirust processing every 12 months with butter. If something abnormal, or replace screw, connected, please handle in time.

7) Cable:

cable sheath crack, damage, if any, please change in time. Thread, such as rust, loose, please handle in time. Replace the power cord when the power cord above note permanent identity do not lose or torn.

connection order: first to load, then the battery, the solar panels. When the battery is connected, the controller of free indicator, a minute later, a discharge indicator, open load. Finally hook up solar panels, controller will according to the light, into the corresponding working condition. If there is a charging current solar panels, controller charging indicator, the state of charging. Controller connection do not change, according to the working status indicator light to check the corresponding working condition.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
Leading the future of green energy storage, ALLTOP will appear at the 137th Canton Fair

Exhibition name: 2025 THE 137TH CHINA IMPORT AND EXPORT FAIRExhibition date: April 15-19, 2025Booth No. : 14.3 f33-34g10-11/14.2 D13-14-15Address: China Import and Export Fair Hall (Canton Fair Hall)
Somali municipal project: ALLTOP solar street lights light a green future
Project name: A municipal project (solar street lamp) in Somalia was successfully implemented
Date: January 04, 2025
Project location: Somalia
Quantity and specific configuration: 500 sets of 0278-400W solar street lights
ALLTOP presents innovative products at the 2024 Solar PV and Energy Storage World Expo
2024 Solar PV & Energy Storage World Expo The 16th Guangzhou Intt Solar Photovoltaic & Energy Storage Exhibition Booth No.Booth B551, Hall 10.2, Area B TIME/August 8th-10th, 2024 ADD: Area B, China Import & Export Fair Complex, Guangzhou
Pv + Agriculture: ALLTOP lights up Pakistani farms with green light, photovoltaic agricultural irrigation project is successful
While actively responding to the "Belt and Road" Initiative, ALLTOP should dig deep into overseas markets and carry out accurate market positioning and strategic planning. Comply with the current economic trend in the international situation, while ensuring that its products and services can meet the actual needs of countries along the "Belt and Road", and make ALLTOP unique products can achieve the purpose of truly serving the "Belt and Road", so as to achieve a soft landing and grounding; A pr
Shaping the Future of Energy ALLTOP at the Expo Georgia Exhibition Center
Live up to the old expectations! On April 26,The 28th International Exhibition for Buildi had its grand opening. ALLTOP team appeared in 118A, Hall 11.36, brought many new photovoltaic products, outdoor street lights, photovoltaic energy storage and other one-stop systematic solutions, attracted more than 300 industry leading enterprises to participate in the exhibition, many visitors have stopped to visit, exchange, tens of thousands of visitors, customers together, a glimpse of the annual indu
no data
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service
detect