1) Solar panels: assembly good street lamps, or 3 months once every six months to clean. Cleaning process to meet the smooth surface with cloth to wipe clean, the available water. It is strictly prohibited in the backlight surface water to clean solar panels from bottom to top. Solar panels weeks
1) Solar panel:
good street lamp assembly, or 3 months once every six months to clean. Cleaning process to meet the smooth surface with cloth to wipe clean, the available water. It is strictly prohibited in the backlight surface water to clean solar panels from bottom to top. Solar panels can't there are tall trees around, or blocking solar threatening the sunlight absorption buildings.
2) Lamps and lanterns of lamps and lanterns:
glass cover with cloth to wipe clean, the available water. It is forbidden to use high-pressure water gun to clean lamps and lanterns.
3) Valve control type sealed maintenance-free lead-acid battery:
this is a maintenance free batteries. Use of general need for battery during rehydration and other maintenance. Every 12 months for a nominal voltage detection, if the deviation is too big need to supplement. Maintenance-free lead-acid battery or replacement. Lead-acid battery terminals need anti-oxidation processing make butter.
4) Light pole:
appearance surface have to take off the lacquer phenomenon is found, please antirust processing in a timely manner. If you have serious deformation phenomenon, it is forbidden to continue to use.
5) Solar panel bracket to connect to the light pole:
solar panels stents with light pole have to take off the lacquer phenomenon is found, please antirust processing in a timely manner. In the case of any changes of solar panel bracket light of attack Angle, please adjust. If you have to take off the lacquer surface, please antirust processing in a timely manner. Adjust to south direction when solar panels.
6) Screw fasteners:
check all screw fasteners and connection screw, antirust processing every 12 months with butter. If something abnormal, or replace screw, connected, please handle in time.
7) Cable:
cable sheath crack, damage, if any, please change in time. Thread, such as rust, loose, please handle in time. Replace the power cord when the power cord above note permanent identity do not lose or torn.
connection order: first to load, then the battery, the solar panels. When the battery is connected, the controller of free indicator, a minute later, a discharge indicator, open load. Finally hook up solar panels, controller will according to the light, into the corresponding working condition. If there is a charging current solar panels, controller charging indicator, the state of charging. Controller connection do not change, according to the working status indicator light to check the corresponding working condition.