loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

What is the daily maintenance of solar street lamps?

1) Solar panels: assembly good street lamps, or 3 months once every six months to clean. Cleaning process to meet the smooth surface with cloth to wipe clean, the available water. It is strictly prohibited in the backlight surface water to clean solar panels from bottom to top. Solar panels weeks

1) Solar panel:

good street lamp assembly, or 3 months once every six months to clean. Cleaning process to meet the smooth surface with cloth to wipe clean, the available water. It is strictly prohibited in the backlight surface water to clean solar panels from bottom to top. Solar panels can't there are tall trees around, or blocking solar threatening the sunlight absorption buildings.

2) Lamps and lanterns of lamps and lanterns:

glass cover with cloth to wipe clean, the available water. It is forbidden to use high-pressure water gun to clean lamps and lanterns.

3) Valve control type sealed maintenance-free lead-acid battery:

this is a maintenance free batteries. Use of general need for battery during rehydration and other maintenance. Every 12 months for a nominal voltage detection, if the deviation is too big need to supplement. Maintenance-free lead-acid battery or replacement. Lead-acid battery terminals need anti-oxidation processing make butter.

4) Light pole:

appearance surface have to take off the lacquer phenomenon is found, please antirust processing in a timely manner. If you have serious deformation phenomenon, it is forbidden to continue to use.

5) Solar panel bracket to connect to the light pole:

solar panels stents with light pole have to take off the lacquer phenomenon is found, please antirust processing in a timely manner. In the case of any changes of solar panel bracket light of attack Angle, please adjust. If you have to take off the lacquer surface, please antirust processing in a timely manner. Adjust to south direction when solar panels.

6) Screw fasteners:

check all screw fasteners and connection screw, antirust processing every 12 months with butter. If something abnormal, or replace screw, connected, please handle in time.

7) Cable:

cable sheath crack, damage, if any, please change in time. Thread, such as rust, loose, please handle in time. Replace the power cord when the power cord above note permanent identity do not lose or torn.

connection order: first to load, then the battery, the solar panels. When the battery is connected, the controller of free indicator, a minute later, a discharge indicator, open load. Finally hook up solar panels, controller will according to the light, into the corresponding working condition. If there is a charging current solar panels, controller charging indicator, the state of charging. Controller connection do not change, according to the working status indicator light to check the corresponding working condition.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service