loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

What are the solar street lamp installation experience

Solar street lamps installed easily neglected problems:

a, installation time. Should be installed in sunny day, if installed in rainy day, after the lights charging power consumption not only, can not meet the design requirements.

2, should not be installed the day light, many engineering contractor to eager to see the light effect, installed the evening lights. Because the new battery is not slow in factory time electricity, if installation is brightness, is the number of rainy days can not meet the design. Is the right thing, after the installation, then good controller, but don't pick up the load, the second day Bai Tianchong after one day, the evening to pick up the load, thus the capacity of the battery can achieve a higher degree, of course, this can increase a part of the Labour cost.

3, the Angle of the panels, general factory is designed according to the 45 degree Angle, this is to ensure that the winter can have a good charge. But direction Angle is determined by the installation time, underground assembly of solar panels, when it is found that light pole tree the Angle deviation, if partial, generally will not adjust. The angular deviation in addition to affect the charging, will also affect the voltage of solar panels under the same light, lead to the solar street light turn on the light time error is larger. So when assembled on the ground, try to adjust the Angle of solar panels and keep consistent!

4, the connection of the controller. Should try to use waterproof controller to ensure long-term stability at the same time, also can avoid the user change lights on time. Such as using the controller is not waterproof, due to the terminal blocks down, wiring a u-shaped bend, this can prevent water from online pour into the controller.

5, using good quality copper core. Because of conductivity, in the process of output current and voltage loss to a certain extent, this not only increase the power, severe cases can lead to LED the launch of the power supply cannot work normally. I have found a similar problem in the practical work, the parameters of the drive power set up correctly, in the laboratory using everything is normal, but after installation on the lamp holder, the light is 15 seconds out. After verification, the line because of poor quality, the loss is bigger, after from the controller output to socket voltage is too low to pass on them. 【 The above content released by solar street lamps factory finishing for you 】

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service