loading

We are a leading manufacturer of solar power utilization and lighting systems

What are the signs of installation order

①The quality of all traffic sign components transported to the construction site should meet the relevant technical standards and be approved by the supervision engineer before they can be used; ②After arriving at the site, make full use of signs, road rails and other safety facilities to manage pedestrians and traffic and strictly follow the operation Rule construction to ensure the safety of passers-by and operators, try to prevent accidents, and ensure construction safety; ③Strictly follow the requirements of construction drawings and determine the location of signs according to the direction of traffic flow; ④Follow the design drawings after the foundation position is measured Excavation of the foundation at the specified location for the specified size, and treatment according to the regulations, erect the formwork, tie the steel bar, and pour the concrete, the anchor bolts and the base flange are in the correct position and reach the specified elevation; ⑤ The erection of the sign supporting structure should be in It will be carried out after the strength of the foundation concrete meets the requirements and is approved by the supervision engineer. The flange of the pillar and the base flange of the concrete foundation should be level and close, and the anchor bolts should be properly matched, and the pillar must not be inclined after the bolts are tightened; ⑥The sign board should be fixed to the pillar by connecting accessories such as sliding bolts and hoop; The distance between the inner edge of the sign board of the pillar sign and the edge of the road shoulder shall be 20cm, the height of the lower edge of the single pillar sign shall be 250cm from the road surface, and the clearance of the cantilever installation shall be 5.2m away from the road surface; Check and adjust the verticality and height of the board to meet the specified requirements; ⑧The sign layout for cantilever sign installation should be perpendicular to the center line of the road. When the road side pillar sign is installed, the sign layout should be as perpendicular as possible to the center line of the road. Or at a certain angle: the direction and warning signs are 0-10 degrees, the prohibition and indication signs are 0-45 degrees, the sight guidance signs are 80-90 degrees; ⑨After the sign board is installed, all sign boards should be cleaned. Keep the layout clean.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
CCTV Authority Spotlight: Alltop's Innovative Energy Storage Products Shine at Canton Fair

CCTV featured Alltop's innovative energy storage products at the Canton Fair, highlighting the company's technological strength and market leadership. The brand drew significant attention and orders at the event, with its booth attracting global visitors and showcasing advanced renewable energy solutions. The coverage underscored Alltop's expertise in energy storage systems and smart solar lighting, earning national recognition for its innovation.
Invitation | From October 15th to 19th, ALLTOP invites you to attend the 138th Canton Fair together!

The 138th China Import and Export Fair

Date: Oct. 15th-19th, 2025

Booth No.:14.3F33-34G10-11

Add: China Import and Export Fair Complex (Canton Fair Complex)
Global Witness, Technological Breakthrough! ALLTOP Showcases Comprehensive Solutions at Solar PV & Energy Storage World Expo

Solar PV & Energy Storage World Expo

The 17th Guangzhou Intl Solar Photovoltaic & Energy Storage Exhibition

th No.:10.2 B551

Date: 8th-10th, August 2025

ADD: Area B, China Import & Export Fair Complex, Guangzhou
Leading the future of green energy storage, ALLTOP will appear at the 137th Canton Fair

Exhibition name: 2025 THE 137TH CHINA IMPORT AND EXPORT FAIRExhibition date: April 15-19, 2025Booth No. : 14.3 f33-34g10-11/14.2 D13-14-15Address: China Import and Export Fair Hall (Canton Fair Hall)
Somali municipal project: ALLTOP solar street lights light a green future
Project name: A municipal project (solar street lamp) in Somalia was successfully implemented
Date: January 04, 2025
Project location: Somalia
Quantity and specific configuration: 500 sets of 0278-400W solar street lights
no data
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service
detect