loading

We are a leading manufacturer of solar power utilization and lighting systems

What are the signs of installation order

①The quality of all traffic sign components transported to the construction site should meet the relevant technical standards and be approved by the supervision engineer before they can be used; ②After arriving at the site, make full use of signs, road rails and other safety facilities to manage pedestrians and traffic and strictly follow the operation Rule construction to ensure the safety of passers-by and operators, try to prevent accidents, and ensure construction safety; ③Strictly follow the requirements of construction drawings and determine the location of signs according to the direction of traffic flow; ④Follow the design drawings after the foundation position is measured Excavation of the foundation at the specified location for the specified size, and treatment according to the regulations, erect the formwork, tie the steel bar, and pour the concrete, the anchor bolts and the base flange are in the correct position and reach the specified elevation; ⑤ The erection of the sign supporting structure should be in It will be carried out after the strength of the foundation concrete meets the requirements and is approved by the supervision engineer. The flange of the pillar and the base flange of the concrete foundation should be level and close, and the anchor bolts should be properly matched, and the pillar must not be inclined after the bolts are tightened; ⑥The sign board should be fixed to the pillar by connecting accessories such as sliding bolts and hoop; The distance between the inner edge of the sign board of the pillar sign and the edge of the road shoulder shall be 20cm, the height of the lower edge of the single pillar sign shall be 250cm from the road surface, and the clearance of the cantilever installation shall be 5.2m away from the road surface; Check and adjust the verticality and height of the board to meet the specified requirements; ⑧The sign layout for cantilever sign installation should be perpendicular to the center line of the road. When the road side pillar sign is installed, the sign layout should be as perpendicular as possible to the center line of the road. Or at a certain angle: the direction and warning signs are 0-10 degrees, the prohibition and indication signs are 0-45 degrees, the sight guidance signs are 80-90 degrees; ⑨After the sign board is installed, all sign boards should be cleaned. Keep the layout clean.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
Leading the future of green energy storage, ALLTOP will appear at the 137th Canton Fair

Exhibition name: 2025 THE 137TH CHINA IMPORT AND EXPORT FAIRExhibition date: April 15-19, 2025Booth No. : 14.3 f33-34g10-11/14.2 D13-14-15Address: China Import and Export Fair Hall (Canton Fair Hall)
Somali municipal project: ALLTOP solar street lights light a green future
Project name: A municipal project (solar street lamp) in Somalia was successfully implemented
Date: January 04, 2025
Project location: Somalia
Quantity and specific configuration: 500 sets of 0278-400W solar street lights
ALLTOP presents innovative products at the 2024 Solar PV and Energy Storage World Expo
2024 Solar PV & Energy Storage World Expo The 16th Guangzhou Intt Solar Photovoltaic & Energy Storage Exhibition Booth No.Booth B551, Hall 10.2, Area B TIME/August 8th-10th, 2024 ADD: Area B, China Import & Export Fair Complex, Guangzhou
Pv + Agriculture: ALLTOP lights up Pakistani farms with green light, photovoltaic agricultural irrigation project is successful
While actively responding to the "Belt and Road" Initiative, ALLTOP should dig deep into overseas markets and carry out accurate market positioning and strategic planning. Comply with the current economic trend in the international situation, while ensuring that its products and services can meet the actual needs of countries along the "Belt and Road", and make ALLTOP unique products can achieve the purpose of truly serving the "Belt and Road", so as to achieve a soft landing and grounding; A pr
Shaping the Future of Energy ALLTOP at the Expo Georgia Exhibition Center
Live up to the old expectations! On April 26,The 28th International Exhibition for Buildi had its grand opening. ALLTOP team appeared in 118A, Hall 11.36, brought many new photovoltaic products, outdoor street lights, photovoltaic energy storage and other one-stop systematic solutions, attracted more than 300 industry leading enterprises to participate in the exhibition, many visitors have stopped to visit, exchange, tens of thousands of visitors, customers together, a glimpse of the annual indu
no data
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service
detect