In our lives, in different places to see the street light type is also different, for high lamp, its modelling is more atmosphere, with wider range of lighting, a full range of light, at the time of night, can bring more pedestrian light, then to
in our lives, in different places to see the street lamp type is also different, for the light,' Light, generally refers to more than 15 meters steel conical light pole and high-power modular fixtures are composed of new type of lighting. 】 , its modelling is more atmosphere, with wider range of lighting, a full range of light, at the time of night, can bring more pedestrian light, so for high lamp installation work, before what is need to be ready to work? Sea ray to summarize high lamp lighting installation before and after some work process.
for high lamp, it is a range of height, ranging from 15 meters to 30 meters, light pole will use a polygon, tend to have 8, 12, 16, and pin pull rod inserting type structure, common there will be 20 m, 25 m, 30 m rural how much solar street light products, on the light pole diameter, diameter, light pole section, the section thickness, the section of wall thickness is different, generally can be designed according to the actual demand, for a light, light pole, can use hot dip galvanized coating processing, apply to the city square, station, port, parking lot, stadiums and other places.
the preparing work before installed in high lamp
1, carefully check the loading and packing list first to check all the components are complete, check the parts whether there is damage phenomenon, if has the damage situation, the timely replacement parts. This is important, if these problems found after the installation is complete, whether to replace or repair, are more complex. So after check clear before installation work effect will be improve a lot, in every part of the light pole will indicate the type of the rod body, if don't match condition, to be replaced, or at the back of the work is more troublesome.
2, installation work, for each joining together to install socket length and size. In the process of installation, easy to produce certain error, in order to convenient, socket when applying suitable force at both ends, to get close the socket. In this process, in addition to pay attention to the installation time is closely connected to ensure their own safety, security, after all, is the top priority we all construction.
3, after the installation is complete, check the
in high lamp installed after check carefully, ditto the power and have a look at the effect, whether can work normally, screw is installed in place, if there is any loose, if found the problem, have to be corrected in time, give full play to its excellent properties.
for light, it looks be like simple, the process of the need to pay attention to every detail, as far as possible let professional master for installation, so as to better to avoid unnecessary trouble. In the later use process, maintenance job will become simple.