loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

The solar street light price is how much money a

Solar street lamps and lanterns installation 1, for each part component is fixed: solar panels fixed on the bracket of solar panels, lamp holder to carry on the arm, then stent with arm fixed to the main stem, and wear the cables to control box ( Battery box) 。 Before 2, light pole, lifting,



solar street lamps installed

1, for each part component is fixed: solar panels fixed on the bracket of solar panels, lamp holder to carry on the arm, then stent with arm fixed to the main stem, and wear the cables to control box 【 The control box is used widely. 】 ( Battery box) 。

2, light pole before operation, each part of the first check fasteners, lamp holder to install whether correct, light work is normal. Then in the simple debugging work is normal; Loosen the solar panels on the controller cable, light work; Connected to the solar panel cables, light; Careful observation of each indicator light on the controller changes at the same time; Everything is normal, before lifting the installation.

3, the main light pole lifting, pay attention to prevention; Screw fastening, such as component sun Angle deviation, need to go up and the sun direction completely toward the south.

4, put the battery into the battery box, according to the technical requirements will be connected to the controller; Connect the battery, and then pick up the load, and then answer the solar panels; Connection operation is important to note that each terminal with indicated on the controller cannot be wrong, plus or minus two polarity can't collision, cannot meet the; Otherwise the controller will be damaged.

5, the debugging work is normal; Loosen the controller solar panels on the wire, the light; Connected to solar panels connections at the same time, the light went out; Again carefully observation of each indicator light on the controller changes; Everything is normal, can seal control box.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service