loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

The next two years India will auction 60 gw solar, 20 gw of wind power

In order to install 175 gw by 2022 renewable energy targets, the Indian government said in the annual review, 2018 - And 2019-19 20 years in 60 gigawatts of solar and 20 gigawatts of wind power, keep for project execution and the execution time for two years.

can't say India's renewable energy industry, there is no problem, but the MNRE survey found that as of October 31, 2018, India in the global renewable energy installations, ranked no. 5 is about 73. 35 gigawatts of installed wind 34 of them. 98 gigawatts (gw), no. 4; Solar power 24. 33 gw, ranked fifth. In about 73. 35 gw of installed renewable energy, including small hydropower 4. 5 gw and biological power 9. 54 gw。

in addition, there are a total of 46. The capacity of 75 GW project has bid or is installed, including 36. 6 GW of solar and 9. 42 GW of wind power.

as of October 31, 2014, India's renewable energy installed capacity of 35. 51 gw, in the past four and a half years, to October 31, 2018, India's renewable energy installed capacity of 73. 35 gw, increased by about 106%, renewable energy installations has accounted for the country's total installed capacity ( 347. 37 gw) Of 21%.

in the field of grid solar, MNRE said that as of November 2018, has been in 21 states approved 47 total capacity of 26694 megawatts of photovoltaic power station

last week, the MNRE in Leh and Ladakh introduced 23 GW of solar projects. The first phase of the plan involves the Kargil area 2. 5 GW pv capacity, as well as Leh district 5 GW of capacity.

at the same time, in the field of off-grid, more than 4 million solar lamp and lamp, 1. 7 million solar home lights, 640000 solar street lamps and 196000 solar pump.

in general, given India's climate treaty commitments in Paris in 2015 to 2030 will be the goal of at least 40% of its electricity from clean sources, a number that is encouraging.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service