loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

The National Development and Reform Commission: lead battery standard recovery more than 60% at the end of 2025

On August 14 news, National Development and Reform Commission, the National Development and Reform Commission will lead battery recycling management interim measures ( Draft) 'Public comment. Paper pointed out that the state shall implement a lead battery recycling target responsibility system, make standard of release lead battery recycling rates. By the end of 2025, the standard recovery rate to achieve 60% above, national collection targets according to the industry development situation timely adjust.

paper requirements, lead battery production enterprises, through recycling, and social recycling enterprise cooperation, bear the liability for complete recovery of target, the premise to hand in the end of march every year annual target completion report. Encouraging lead battery production enterprises and the enterprises which are engaged in recycling of waste lead accumulator, etc. To form a consortium to complete recycling target responsibility.

paper pointed out that the state shall practise a system of whole life cycle of lead battery unified coding, coding standards by the market supervision administration and National Development and Reform Commission, Ministry of Industry and Information Technology, the ecological environment to make. Lead battery production enterprises should be prominently marked in the lead battery products meet the national unified coding standard of the product code, product code should be in the lead battery product whole life cycle is not easy to damage, can be read clearly. To implement the unified code before the market the stock of battery, by recycling outlets in recycling those who meet the national unified coding standard recycling code.

paper mentioned, lead battery recycling target completion of production enterprises, as well as the implementation of producer responsibility into the enterprise credit evaluation system, to the serious breach of paper clearly, lead battery production enterprises in electrolyte when the battery assembly installation of tamper label after sealing, importers in the battery sealing position with tamper logo. Tamper label complete undamaged waste lead accumulator, in the collection, staging, storage, transportation and other links the conditional release of hazardous waste management; No tamper identification, tamper label is not complete, has broken waste lead accumulator, according to the hazardous waste management.

paper, scrap lead battery recycling network, transit storage, centralized storage to library integrated management to the provincial level according to different type of circular economy and ecological environment protection departments for the record. For the record, may not be to carry out the collection of waste lead accumulator, staging, storage, transportation and other business.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service