1, scientific selection determine the position of the light pole solar street lamps, light pole foundation scientific design. First determine the location, at the top of the solar street lamps are requested not to have a long time to keep out sunshine trees, buildings and other objects, secondly to understand confirm light pole position without the cable,
1, scientific selection determine the position of the solar energy light pole, light pole scientific design. First of all, to determine the location, at the top of the solar street lamps are requested not to have trees, buildings, and other objects for a long time to keep out sunshine. Second, to ensure that the light pole location without cables and pipelines and other facilities. However, after the high street lamp lighting, the investigation of geological conditions, and according to the surface soil conditions determine the excavation depth and the casting size. 2. In solar energy lamp posts meet the requirements of the design basis, the installation position of the excavation of embedded parts location and casting. Embedded parts ( Grounding cage) Should be placed in the center of the square hole. One end of the PVC pipes should stand in the center of the embedded parts and the leakage, and the other end should be exposed in the place of storage battery. Require the embedded parts and foundation and the ground at the same horizontal plane, Live at the top of the screw and the original ground in the same horizontal plane) 。 By adopting the C20 concrete pouring should be paid attention to casting, to adjust the direction of the cage. Casting should be used when the vibrator to compaction. At the same time, should protect embedded parts thread ( Can use paper or tape wrapped or PVC tube cover) 。 3, construction pouring slurry residue in to clean up after the completion of positioning plate, check and clean up the impurity on the bolt; 4. Solidification process of mixed soil need regular watering and maintenance. In general, to ensure the concrete completely solidified need 72 hours. At this moment, can undertake the installation of solar street light.