loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Specific process of fixed light transformation

Last we've talked to the stationary light, way of modification, said that now we detailed under stationary light, transformation of the specific process. First of all, according to the reconstruction of port construction projects, expansion, docks, freight yard, whether to need to Ann, lamp holder let rise in a certain distance, after the lock claw rise to the surface, stop rising and start landing lamp holder, lock claw when falling, contact with the lock block D physiognomy, the counterclockwise rotation Angle, thus over the lock, the lamp holder can be smoothly down to the bottom of the rod. Thus determine the stationary high lamp renovation plan. According to the actual production schedule, the lifting of light, arrange production in advance. According to the production status of the terminal and homework assignments, based on the fixed high lamp will transform from full discharge. Then was ready to lift outdoor high lamp installation modification on the berth, about two days, can be used. To remove the stationary light back to factory,, making it a lift high lamp. The modified high lamp, again for the new position or the next to transform.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
You're Invited! Visit ALLTOP at Stand H1.10 – Solar & Storage Live Nigeria 2026

Event: Solar & Storage Live Nigeria 2026
Dates: July 14–15, 2026
ALLTOP Booth: Stand H1.10 (prime location – we look forward to seeing you there!)
Address: Landmark Centre, Lagos, Nigeria
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service