Solar wind into jiangxi green energy1

According to its Chinese jiangxi electric power co. , LTD. , the latest statistics show that by the end of march, new energy into the net power generation unit capacity has reached 8. 31 million kilowatts, year-on-year growth of 18. 23% and 95% of the province of installed. For new energy installed continued rapid growth, its power of jiangxi actively implement the national energy strategy, in the protection of the clean energy grid, given comprehensive ShiCe, much work has been done and achieved positive results, the current in jiangxi province's new energy to achieve a full grid, given in full.

new energy grid installed in wind power, photovoltaic (pv) is given priority to, among them, the photovoltaic (pv) grid has a capacity of 5. 55 million kilowatts, findings and the wind power has been increased to 2. 4 million kilowatts.

in addition, in November 2017, the new energy that is beyond hydropower capacity, become after thermal power, jiangxi power grid installed in the second largest electricity power supply. The current leading momentum is also expanding, and its capacity of new energy power accounted remain steady growth. Photovoltaic (pv) and wind power as the mainstay of jiangxi green energy, energy structure optimization in transformation and green development in our province to increasingly play an important role.

in jiangxi province as a & other; Lack of coal and oil exhaust & throughout; Province, developing low-carbon economy, the use of low carbon energy be its implementation & other; The rise of green & throughout; The inevitable choice. Industry experts point out that, in recent years, new energy showed vigorous development trend, behind it with the strength of the market drivers and power grid enterprise initiative as inseparable.

among them, the grid is a new energy delivery and optimize configuration platform to support important part is the development of new energy. In order to speed up to promote jiangxi energy clean and low carbon transformation, focusing on clean energy development with high quality service, its power in power grid construction in jiangxi, optimization scheduling and so on have done a lot of work. Set up leading group, promote new energy given normal developing new energy given research; Don't regularly issue given early warning, guide the new energy reasonable layout; To strengthen the construction of transmission channels to be delivered to the outside, and improve the new energy acceptance ability, only 2018, 500 kv and below new energy grid and transportation project is complete with a total investment of about 900 million yuan. This year will continue to build a number of key transmission project in the province, in order to meet the project of new energy generation (dg) and needs to be delivered to the outside; Actively promote & other; A pay has been & throughout; Uhv project and improve the ability of resource allocation in grid; Optimization of new energy, the operation of ascension grid balance adjustment ability, realize new energy given priority; Promote houmpheng development of phase ii and FengXin pumped-storage power station, relieve the contradictions of power grid peak shaving gap; Photovoltaic poverty alleviation by network service, promote interconnection efficiency; Given new energy power across the province actively, expand new energy given market. Benefit from this, the new energy grid abandoned discard wind has yet to happen.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service