Solar street light on for a while

Solar street lamp installation steps: step 1: embedded parts dug a pit embedded battery box and the embedded parts of fixed light pole. Battery box installation fastening screws, waterproof and threading pipe, waterproof threading tube into the lamp-post base to 20 cm above the ground, to ensure that the rain



solar street lamp installation steps:

installation steps 1: embedded parts' Embedded parts ( Precast and built-in) It is pre-installed ( Buried) Artifacts within the concealed work. Is casting is placed in the structure of components, the lap of the upper masonry structure based on. 】

digging holes embedded battery box and the embedded parts of fixed light pole. Battery box installation fastening screws, waterproof and threading pipe, waterproof threading pipe into the lamp-post base to 20 cm above the ground, to ensure that the tianshui soaked in the rain light pole flange will not fill the battery box. Embedded parts should be flat, is light pole base, then pouring concrete.

embedded parts

installation step 2: light pole assembly parts

light pole accessories generally have modelling class components and lamp holder, solar panels, 【 Solar panels, 太阳能板) Is by absorbing sunlight, the solar radiation through the photoelectric effect or photochemical effect directly or indirectly converted into electrical energy device, the main material of most of the solar panel as the 'silicon', but because of the production cost is larger, so it widely used, we still have some limitations. 】 Wiring, etc. , according to the figure after assembled, with two root first cable or sheath line respectively, lamp holder and solar panels components 【 Solar energy battery components by imports ( Or domestic) Single crystal ( Or polycrystalline) Parallel of silicon solar cell, with toughened glass, EVA and TPT by hotlamination, equipped with aluminum alloy frame, has the strong wind, hail, installation is convenient wait for a characteristic. 】 , attention is negative when wiring, wire than light pole slightly longer, and then the wire from the light pole to wear out to check the position.

light pole component

installation step 3: install the lamp post

with crane embedded parts will be assembled light pole lift to base, will be the power of the battery at the bottom of the light from the light pole through to check the mouth position, then aim the light pole screw holes at the bottom of the embedded parts screw, centralizer tighten nut. ( Pay attention to the lamp holder and the direction of panels, avoid obstacles blocking to solar panels, in order to avoid contact solar panels can't sample cannot be recharged) 。

installation step 4: connect the controller

all parts ( Solar panels, battery, light source) Wires run from the actuators to a controller. First, there will the positive wires run from the actuators to a controller of the light bulb icon corresponds to the red line, will light the cathode of receiving light bulb icon corresponding to the black line on the controller. Dc voltage with a multimeter archives check out the battery wire is negative, the battery positive electrode wire received controller on the battery icon corresponding to the red line, the battery cathode wires run from the actuators to a controller of battery on the black line.

the multimeter dc voltage archives check out across the electrodes of solar panels to qualify, the positive wires run from the actuators to a controller of the solar panels have solar panels on the icon corresponding to the red line, the solar panels of the cathode wires run from the actuators to a controller on the solar surface should be black.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service