Solar monitoring rod installation instructions - 2020 09 - 28 hits: 211 solar monitoring pole has a very wide range of use, then today we will read the installation instructions, follow the below small make up together to get to know. One, solar street lights and the original work
solar control rod installation instructions
- 2020 09 - 28 hits: 211
solar monitoring pole has a very wide range of use, then today we will read the installation instructions, follow the below small make up together to get to know. One, the composition and working principle of the solar street lamps mainly consists of solar modules, solar street lamps intelligent controller, maintenance-free batteries, light source, light pole and structure, etc. Working principle of solar street lights are: solar cell components converting solar radiation into electricity during the day, to the free maintenance battery charging, provided by the battery to light load power at night, the light source in the bright light automatically when it gets dark. Intelligent controller for battery overcharge, discharge protection, open and lights of the light source and time control. Second, the foundation pouring 1, determine the floorlamp position; Survey and geological conditions, if the surface of the 1 m 2 are all a hotchpotch of soft soil, the excavation depth should be deepened; At the same time to confirm the excavation position under no other facilities ( Such as cable, pipes, etc. ) For street lamps at the top of the no shading objects for a long time, or to appropriate change of location. 2, in the position of lamps and lanterns (reserved The excavation) Conform to the standard 1 m 3 pit; Up with location and casting. Embedded parts are placed in the square in the middle of the pit, PVC threading pipe end in embedded inserts right in the middle, on the other end in the storage battery ( As shown in the above) 。 Keep the embedded parts, foundation and ground in the same horizontal plane, Or the top of the screw and the original ground in the same horizontal plane, according to the requirements of the site and decide) , one side should be parallel to the road; This can guarantee the light pole erected after correct and not skewed. Fixed and then to C20 concrete pouring, casting or stop using vibrator vibration in the process, to ensure that the overall density and robustness. 3, construction completed, clear in time positioning plate residual sludge, and the waste oil cleaning bolt impurities. 4, concrete solidification process, water them regularly maintenance; To concrete is set ( Generally more than 72 hours) To install droplight. Three, solar energy battery components installation 1, the output of the battery components are negative in the connection to the front of the controller must take measures to prevent short answer; 2, solar battery components and bracket connection should be solid and reliable; 3, components, the output of the line should avoid to be exposed, and tie fastened; 4, battery components towards to the south, the compass points to the shall prevail. Four 1, battery, battery installed in the control box to must take light put, prevent broken control box; 2, battery cables must be between bolts on the terminal of battery and use copper gaskets to increase electrical conductivity; After 3, output lines connected to the battery in any case banned short sub, avoid damage to the battery; Line 4, the output of the battery and controller connected in the telegraph pole must through PVC pipes; 5, after completion of the above, check the wiring controller, prevent short circuit. After the normal close the door of the control box. 5, 1, lamps and lanterns is installed in each part component is fixed: solar panels fixed on the bracket of solar panels, lamp holder to carry on the arm, then stent with arm fixed to the main stem, and wear the cables to control box ( Battery box) 。