loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Solar street lamps made light pole how to operate1

Light pole lifting when must pay attention to the surrounding environment, such as overhead conductors, trees and billboards, scaffolding, buildings, etc. , completes the safety measures. Each part of the light pole before lifting, first check fasteners and firm, lamp holder to install whether correct, light source is working is normal. Then debugging system work is normal; Loosen the controller of solar panels on the wire, the light source should work; Cable connected to solar panels, lamp shall be put out. Careful observation of each indicator light on the controller changes at the same time, when everything is ok before lifting the installation. When the main light pole lifting, pay attention to safety, screw to absolute good fastening, such as component sun Angle deviation, need to adjust the direction of the sun to make it fully toward the south.

the lifting rope wear in light pole appropriate location and slow lifting of lamps and lanterns, pay attention to avoid the crane rope scratched the solar cell components, in the process of increase, when the solar street light completely off the ground or out of the vehicle in full, at least two installation personnel using large wrench clamping flange, prevent the lamps and lanterns is in the process of lifting the upper due to swing at the bottom of the lamps and lanterns and crane rope friction and damage to the coating layer, etc. When the lifting of lamps and lanterns to the foundation above, slow down the lamps and lanterns, rotating light pole at the same time, adjust the lamp holder is on the road, the flange plate of the anchor bolt holes are aligned. On the flange after fall on the ground, in turn set 30 flat pad ( Or 24 flat pad) Spring washers, 30 ( Or 24 spring washers) And (( Or m2-m24) Nut, with a spirit level adjust the verticality of light pole. If the light pole is not vertical with the ground, can be in light pole mat under the flange gasket vertical to the ground, finally using a wrench nut evenly tighten, tighten the former should daub thread locking glue. For m2-m24 bolts ( 8. 8) , rotating torque for 650. 6 n。 M; For (bolt ( 8. 8) The tightening torque for 1292. 5 n。 M。

remove lifting rope, check whether solar modules facing south. Otherwise to adjust. Adjust the direction of the solar cell components, the long drop devices will be installed 1 to 2 sent to the appropriate height, installation personnel light pole components on one by one with a wrench to loosen the fastening bolts, then based on the compass, turn on light pole component to the appropriate location, the last one by one on light pole fastening components of fixed bolt, and ensure the machine to receive strength evenly in the bolt. 【 The above content released by solar street lamps factory finishing for you 】

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service