loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Solar street lamps light pole assembly?

Check to make sure the installed position light pole model is correct, Such as single head and double head) With the length of the corresponding jump arm; The appropriate wire cutting to the corresponding position, generally on both ends of the wire stripping the reserved 150 mm. Install jump arm and lamp holder, determine the position of lamps and lanterns and levelness

check to make sure the installed position light pole model is correct, Such as single head and double head) With the length of the corresponding jump arm; The appropriate wire cutting to the corresponding position, generally on both ends of the wire stripping the reserved 150 mm. Install jump arm and lamp holder, determine the location and levelness of lamps and lanterns, light pole as the benchmark. After wiring check whether light line tighten firmly. Connected to the light source and threading, according to the instruction manual correct connection wire, pay attention to is the cathode. After connect the line to check whether the connection is firm. Source in the process of installation, the lamp of the smooth surface is perpendicular to the ground, LED street light, rather than jump arm side of installation. After connect the light source, use multimeter to test its first value, and with the presence of earthing rod body phenomenon, use battery lights to test, after confirm the connection is correct.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service