Solar street lamps installed wrong?

Solar street lamps have several big installation error, slightly do not pay attention, will lead to good solar street light can't normal use, how to do? Is hard for a few hours, want to reinstall again?

solar street lamp installation is simple, if still can't normal lights after according to the manual operation, could be made the following installation errors.

installation place too many obstructions

the solar street light is rely on solar power.

in the daytime, solar photovoltaic panels, then converts light energy into electrical energy, stored in the battery.

night, storage battery for power supply, the LED lighting.

so the sun light cannot illuminate the photovoltaic panels or exposure to the photovoltaic panels on the length of time determines the battery charging efficiency, if the installation of solar street light place surrounded by buildings, trees, power lines and other obstructions, will affect the normal absorption and utilization of the pv surface light, lead to electricity shortages, unable to meet the demand of lighting at night.

install solar street lights around obstructions, can appear even photovoltaic panels are occluded part of heating up too fast, so as to cause local fever burn out the phenomenon of photovoltaic panels directly.

the solution:

in the case of can't steer clear of obstructions, facing of the photovoltaic panels can be adjusted, ensure pv look for direction without obstructions and illumination time not less than 6 hours.

photovoltaic panels towards error

when installing solar street light photovoltaic panels should be installed in the direction of sunny, otherwise it will cause the photovoltaic panels can't absorb light energy, thereby reducing the charging efficiency.

installed symmetry is is a common mistake, side panels towards relatively, which side is right, on the other side must be wrong.

the solution:

make sure good toward poling, domestic general facing south.

photovoltaic panels on the indoor charging

some solar street lights will be installed in the building or the shed, to facilitate daily or parking.

although these places had light during the day, but cannot reach to maintain normal solar street lamps lighting illumination level required for power requirements, in the long run, will cause damage to the battery.

solution:

to ensure photovoltaic panels light is enough, can take indoor lighting, outdoor charge separation installation, photovoltaic panels will be moved to the outside.

next to have other solar street lamps light source

intelligent control is a big advantage of solar street lamps, it can be according to the seasons, day and night alternate control lights and lights out, do not need artificial operation. But if appear next to the other light source, optical function will fail, solar street light can't light at night.

solution:

if you can't remove interference of other light sources can be optically controlled mode set to time control mode.

some incorrect erection can do changes in installed, but some are more difficult, so before installing solar street light must value relevant considerations! ! !

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.