loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Solar street lamps factory of two solar street lamps application is analysed

- -

as solar technology, solar technology into the rural road lighting. Now rural roadside mount the solar street light uniformly, it green and energy saving, convenient installation, by the people of all ages. As the saying goes, there is no perfect in the world, although the solar street lamps have many advantages, but there are still some deficiencies in the process of practical application. Solar street lamps factory technicians took everybody today under the analysis of the two major disadvantages of solar street light applications.

a, street lamps in use after a period of time, often a few days don't work.

the main cause of the problem lies in the component configuration is too low, also can have high battery configuration, but the main or the former. After days of rain, the street lamp system battery discharge, the controller will appear over discharge protection, at this time if fewer solar power, storage battery voltage are not up to restore the discharge voltage of the controller, the controller has been blackouts, between the load and component size is too small or rainy days too long will inevitably lead to a long period of time does not discharge. So the battery needs to be considered in the component volume as a matter of time, ~ day filled with as much as possible.

2, design the service life of the battery in ~ years or so, the actual battery use often lower than the design life, or even years.

the main cause of the problems lies in the improper battery configuration or work. Such as battery capacity small relatively continuous rainy days, or has been in the deep cycle battery to work. The first kind is the main reason.

some solar street lamps manufacturer, in order to reduce the above problems, tend to solar street lamps controller restore discharge voltage setting is too small, lead to battery charge is often very little and then in the discharge state, did not make good use of the storage battery, reduce its service life. Want reasonable setting so solar street lamps controller back discharge voltage.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service