First, check to make sure the installed position light pole model is correct, Such as single head and double head) With the length of the corresponding jump arm; The appropriate wire cutting to the corresponding position, generally on both ends of the wire stripping the reserved 150 mm. Installation of jump arm and lamp holder, LED street lamp, determine the lamps and lanterns is
in the first place, check to make sure the installed position light pole model is correct, Such as single head and double head) With the length of the corresponding jump arm; The appropriate wire cutting to the corresponding position, generally on both ends of the wire stripping the reserved 150 mm. Install jump arm and lamp holder, the LED street lamp, to determine the location and levelness of lamps and lanterns, light pole as the benchmark. After wiring check whether light line tighten firmly.
between light source and threading, according to the instruction manual correct connection wire, pay attention to is the cathode. After connect the line to check whether the connection is firm. Source in the process of installation, the lamp of the smooth surface is perpendicular to the ground, not install jump arm side. After
to connect the light source, use multimeter to test its first value, and with the presence of earthing rod body phenomenon, use battery lights to test, after confirm the connection is correct.
want to know more about solar LED street light? Then come to macau, photoelectric.