Solar street light way buried battery? Can be assembled battery box before you put it in the dug a pit, zhongshan new energy co. , LTD. Is engaged in the production design of solar street light, high lamp factory, 20 years experience in production of solar street lamps, and create the most
the solar street lamps Solar street light is a crystalline silicon solar battery power supply, valve control type sealed and maintenance-free battery ( Gel battery) Store electricity, super bright LED as light source, lamps and lanterns and controlled by the intelligent charging and discharging controller, is used to instead of the traditional public power lighting lamps. 】 Buried storage battery?
after assembled battery box, can put it in the dug a pit before, zhongshan new energy co. , LTD. Is engaged in the production design of solar street light, high lamp factory, 20 years production experience, solar street lamps to build the most professional manufacturer of solar street lamps,. , because the battery is heavier and restricted by the construction environment, 2 - best Three people together. Battery box into the pit after proper adjustment, to make it in a state of degree. And from before buried PVC steel wire hose thread tube 【 Threading pipe full name 'building electrical insulation sleeve'. 】 Wear to the ground. The backfill earthwork, restore pavement as is. Note: A. Began after buried storage battery box, working pit digging well adjust the degree of battery box, after making the battery into is in a state level. B。 Winter is longer, if the installation address should be placed in the battery box insulation cotton, but also increase the efficiency of the battery use necessarily extent. C。 The output of the battery and pole in the controller should be used when connecting through PVC pipes; D。 Embedded threading tube ( Protecting tube) Inside diameter shall not be less than 1 wear steel wire hose diameter. 5 times, protecting tube bending, shall not be less than 2 times, avoid the dead corner. E. Protective tube can not have perforation, crack and refuses to accept the convex-concave defect, the lining should be no burr satiny, no the clutter. F。 Steel wire hose from down to up the PVC tube wear out of the ground, after the installation backfill earthwork recovery road as-is, to clean up the construction site.