Solar street lamp installation process and method you master? Solar street lamps factory today small make up the detailed explanation: 1, insulation test: with shaking table telemetry insulation resistance between line and ground, check whether the cable is in good condition, with or without leakage, all the test values
you have mastered the installation process and methods of solar street lamps? Solar street lamps factory today small make up the detailed explanation:
1, insulation test: with shaking table telemetry insulation resistance between line and ground, check whether the cable is in good condition, with or without leakage, the test values shall conform to the requirements of the specification, remote sensing, the discharge should be core over the ground. Cable ends after the application of rubber cloth seal wrapped with tape.
2, solar street lamp installation:
( 1) With the location of the solar street lamp installation height ( From the light source to the ground) , elevation Angle and lighting direction should be consistent.
( 2) Installation of lamps and lanterns longitudinal centerline and longitudinal center line of arms should be consistent, lateral horizontal line of lamps and lanterns should be parallel to the ground, after fastening visual should not have skewed.
( 3) Lamp holder fixation, adjustable lamp holder should adjust to the correct position according to the design, the lamp holder wiring should comply with the provisions of
( 4) All kinds of nut fastening, appropriate add washer and spring washer.
3, electrical equipment installation:
( 1) Materials to be present after the unpacking inspection, the inspection qualified rear can be used for installation.
( 2) Dynamic contact and should match the centerline of the static contact, the contact should be close contact.
( 3) The secondary loop of the auxiliary switch switch contacts should be accurate, reliable contact.
( 4) Mechanical locking, electric locking action should be accurate and reliable.
( 5) Grounding system must be solid and reliable and conform to the requirements of the drawings and specifications.
4, experiment, testing, debugging equipment, instrument, instrument must be approved by the state have qualification qualification check by the relevant units of measurement, and use, custody.
( 1) Electrical wiring insulation testing must be qualified, impedance matching, appropriate wiring is correct, clear and complete.
( 2) Instrument should be responsive, accurate measurement, zero right, indicating accuracy, variation and recording accuracy accord with the requirement of specification.
( 3) Check after the installation is complete, confirm correct, before adjustment of the component.
( 4) Breakdown, after the completion of debugging can be carried out system debugging, linkage debugging and commissioning.
all the above is our introduction, want to learn more knowledge of solar street lamps, please focus on this site, we will provide professional solutions and services.