1, establish the lamp installation location: according to the situation of the construction drawings and the field geological, of no shade on the top of the street lamp, street lamp spacing of 40 meters as basic value determine the installation position of street lamps, or to the appropriate change of street lamp installation location. 2, excavation street lamp
1. Determine the installation position of street lamp: according to the construction drawings and the geological conditions of the field, on the top of the lamp shade place, with 40 meters determine the installation position of street lamp, street lamp spacing for a reference or the lights should be appropriate to replace the installation location. 2. Street lamp excavation: street light foundation pit excavation shall be installed in the street lamp fixed position. If the soft surface, the excavation depth will deepen. And confirm and protect other facilities ( Such as cables and pipelines, etc. ) In the excavation site. 3. To build a battery pack in excavation of the foundation pit, the battery. If the excavation is not wide, excavation will continue to be wide enough to accommodate air between the battery pack. 4. Street lamp based embedded parts casting: in 1 m deep excavation pit, will advance the welded embedded inserts into the pit, and put one end of the steel tube in the middle of the embedded parts, on the other side in a battery buried place. And keep the embedded parts and foundation and the ground at the same horizontal plane. Then use C20 concrete pouring and fixed embedded parts. Pouring process, stir well, keep the compactness and strong degree of embedded parts. 5. After completion of construction, timely cleaning residue on the positioning plate. The installation of solar street light only in concrete after complete solidification ( About 4 days, 3 days), if the weather is fine 。