Tools and equipment needed for installing solar street lights, multimeter, wrench, fine wire, nylon cable tie, shovel, lifting rope ( Material is soft; For steel wire rope, wire rope must be wrapped in cloth belt or in the lamps and lanterns, pad with soft objects, avoid damage to the lamp body



install solar street light [ Solar street light is a crystalline silicon solar battery power supply, valve control type sealed and maintenance-free battery ( Gel battery) Store electricity, super bright LED as light source, lamps and lanterns and controlled by the intelligent charging and discharging controller, is used to instead of the traditional public power lighting lamps. 】 The required tools and equipment: multimeter, wrench, fine wire, cable tie' Cable ties, nylon material of a kind of cable tie. 】 , shovel, lifting rope ( Material is soft; For steel wire rope, wire rope must be wrapped in cloth belt or in the lamps and lanterns, mat with soft objects, avoid damaging the lamp body) , crane, lift car, etc.

install solar cell' Solar cells can effectively absorb solar energy and convert it into a power semiconductor components. 】 Components:

1) Solar cell components connection:

a, open the solar battery components packing and check for damage to the solar cell components;

b, the solar battery components guard plate placed on Angle steel box, and then place the solar battery components on the plate; Put solar cell components, junction box are all high, when the sun electric ChiZu laid-down, junction box should be closer towards the direction of the distance light pole components;

c, according to the system voltage of street lamp and solar cell components of voltage line connected solar cell components, such as street lamp system voltage is 24 v, solar battery components of voltage of 17 or 18 v v, it should be in tandem solar cell components, the positive (of the series method is the first piece of component Or negative) And the second component of the cathode ( Or the anode) Connection, if the voltage of the solar battery components for 34 v, on the solar battery components should be in parallel, the parallel method is the first piece of component is negative and the second component is negative corresponding connection, the solar battery components when wiring connection box with a small screwdriver to open, the solar battery components power cord with a small screwdriver to pressure to terminal connector, require the red line to the anode, the blue line to the cathode, after waiting for line connected to terminal box for the waterproof nut fastening, and the terminal within the terminal box with 7091 seal silica gel, glue quantity 【 Spread to be glued unit dose on the bonding area of adhesives. 】 To make the terminal box into line hole is completely sealed, and then buckle on the junction box cover, junction box cover should fasten, not against.

d, multimeter is used to inspect the solar battery components of attachment ( Answer the controller side) Not with short circuit testing solar cell component output voltage meets the system requirements. In fine weather should be greater than its open circuit voltage 18 v ( System voltage is 12 v) 34 v (or System voltage is 24 v) 。 Before the installation and testing solar battery components power cords to the controller the positive application of insulating tape will be exposed wire core, insulating tape package two layers. Note: the battery components during the installation process should take put down gently, avoid instrument such as damage to it.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service