loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

[Solar Light Factory School] Precautions for installation of solar street light foundation

In fact, the installation of the foundation of solar street lights is very important. If it is not done well, it is easy to cause the solar street lights to tip over, that is, it is easy to be damaged by the solar street lights, and the safety of pedestrians cannot be taken care of. Therefore, we are installing foundation lights. There are a few important points to pay attention to. 1. After excavating the street lamp foundation pit, confirm the buried position of the battery box. It is appropriate to be about 0.5 meters away from the light pole, and the area is about 3 times the area of u200bu200bthe battery box. The depth varies from region to region, generally 60 -120CM2. If 1.2 meters of the ground surface is soft soil, the excavation depth should be deepened; the pit excavated at the position of the vertical lamp should be positioned and poured for the embedded parts. 3. Before pouring, use plastic cloth or cloth to thread the PVC pipe Seal both ends tightly to prevent concrete from entering the pipe and causing blockage. The viscosity of the concrete should be moderate, not too thin or too thick; 4. The incoming concrete should be properly supplied according to the number of workers, so as not to cause the concrete to wait too long and affect the quality of the foundation; 5. Before the foundation pit is poured Preparations should be made, such as the height of the foundation pit, whether there is debris, if there are pipelines in the foundation pit, the leader should be notified in advance to properly handle it; 6. After the construction is completed, the residual mud on the positioning plate should be cleaned in time and cleaned with waste oil Impurities on the bolts, or wrap tape on the screw before embedding. 7. During the concrete solidification process, water should be regularly watered and cured. The chandelier can be installed only after the concrete has completely solidified (usually 4-7 days); the last point to note is , The installation foundation of solar street lights starts from the digging of the pit to the end of the installation. If the construction section is already open, barrier measures must be taken to prohibit pedestrians and vehicles from entering the construction site. This information is exclusively provided by the solar lamp factory lighting, source: http://./

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service