loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

[Solar Light Factory School] Demystifying the solutions to five common problems of wind-solar hybrid street lights

The controller used in the wind-solar hybrid street lamp is to ensure the highest utilization of wind and solar energy. It has the function of 2 independent load outputs and is controlled by intelligent software with precise control. So what problems did it appear in the operation of wind-solar complementary street lights? Then our solar lamp factory will answer those questions one by one. First, no charging, no display: Open the upper cover of the wind-solar hybrid street light controller and check whether the DC fuse of the wind-solar hybrid street light controller is fused. When a fuse is found, first check whether the positive and negative electrodes of the battery and solar panel are connected incorrectly, and then replace the DC fuse of the same specification after confirming that it is correct. Second, the charging voltage is too high: when the battery voltage is higher than 5% of the upper limit of the charging overvoltage protection voltage, there is still charging current measured by the clamp ammeter for solar panels or wind turbines. This fault may be charging wind and solar hybrid street lights The controller is damaged and needs to be replaced. Third, the wind-solar hybrid controller is flickering when the overload lamp is under load. It means that the output of this load exceeds 10% of the rated load, and you should check whether the load is overloaded. Fourth, the wind-solar hybrid street lamp controller suddenly shuts down the output during load work, and the overload lamp is always on. It means that the output of this load exceeds 20% of the rated load or a short circuit occurs, and the load condition should be checked. Fifth, the wind turbine does not rotate: In the case of good wind, other wind turbines are operating normally, when the wind turbine does not rotate or the speed is very slow, please observe whether the direction of the wind turbine's tail rudder is the same as the wind direction. Check whether the wind-solar hybrid street lamp controller shows overvoltage. If the direction is the same and the wind-solar hybrid street lamp controller has no overvoltage, try to disconnect the wind-solar hybrid street lamp controller from the battery. After the wind-solar hybrid street lamp controller stops working, connect the battery again. The generator still does not rotate or the speed is very slow. Try to disconnect the wind generator from the wind-solar hybrid street light controller. The wind generator rotates normally, indicating that the intelligent shutdown system of the wind-solar hybrid street light controller is damaged and needs to be replaced.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service