To make solar led street lamp play their biggest role, then it must be the first to be good right
installation work, only after installed it can normal run and play its role. In the process of solar led street lamp for installation to play good foundation is very important, so solar led street light should be how to proceed with foundation casting?
1, the need to determine the installation position of solar led street light. In determining the location of the time needed to position for a detailed geological prospecting, if it is about 1 m to 2 m below the surface is soft soil, the depth of digging the foundation must be more to deepen. Also the base of the need to make sure that the dig any other pipes, cable facilities, also need to have street light at the top of the shade for a long time, if any, must be timely
2, the position of the need to establish in the lamp, set aside a pit with installation standards, in order to and retrograde embedded parts localization pouring
build. Embedded parts must ensure its located in the middle of the pit, so that can guarantee the lamp installed after light pole vertical deflection. In the process of casting still need to pay attention to use vibrators are kept shaking, so to ensure the overall the compactness and robustness of casting which is very important.
3, in the pouring construction after the completion of the work, must pay attention to in time of positioning plate surface residual sludge to clean up, and use the waste oil to wash the bolts magazine, this is a very important aspect, we in the process of casting must be able to ignore this aspect.
4, in the process of concrete, to his timing for water conservation, will be until the time of concrete completely position of solidification, generally in more than 72 hours, the droplight to their installation work.
that the foundations of the solar led street light pouring work is a very important work, is also the foundation of ensure after installation, so in practice we must pay attention to this aspect, good grasp of the above these methods and steps of pouring work of its implementation correct foundation.