Solar street lamps light pole lifting when must pay attention to the surrounding environment, such as overhead conductors, trees and billboards, scaffolding, buildings, etc. , completes the safety measures. Each part of the light pole before lifting, first check fasteners and firm, lamp holder installation is correct, the light source is
solar street lamp light pole lifting must pay attention to the surrounding environment, such as overhead conductors, trees and billboards, scaffolding, buildings, etc. , completes the safety measures. Each part of the light pole before lifting, first check fasteners and firm, lamp holder to install whether correct, light source is working is normal. Then debugging system work is normal; Loosen the controller on the solar panels 【 Solar panels, 太阳能板) Is by absorbing sunlight, the solar radiation through the photoelectric effect or photochemical effect directly or indirectly converted into electrical energy device, the main material of most of the solar panel as the 'silicon', but because of the production cost is larger, so it widely used, we still have some limitations. 】 Cable, light source should work; Cable connected to solar panels, lamp shall be put out. Careful observation of each indicator light on the controller changes at the same time, when everything is ok before lifting the installation. When the main light pole lifting, pay attention to safety, screw to absolute good fastening, such as component sun Angle deviation, need to adjust the direction of the sun to make it fully toward the south. Lifting rope wear in the appropriate location, light pole, slow lifting of lamps and lanterns, pay attention to avoid the crane rope scratched solar battery components 【 Solar energy battery components is of high efficiency crystalline silicon solar cell lines of toughened glass, super white cloth, EVA, transparent TPT backboard and the composition of aluminum alloy frame. 】 , in the process, when the solar street light completely off the ground or out of the vehicle in full, at least two installation personnel using large wrench clamping flange, prevent the lamps and lanterns is in the process of lifting the upper due to swing at the bottom of the lamps and lanterns and crane rope friction and damage to the coating layer, etc. When the lifting of lamps and lanterns to the foundation above, slow down the lamps and lanterns, rotating light pole at the same time, adjust the lamp holder is on the road, the flange plate of the anchor bolt holes are aligned long 【 Mechanical components are installed on the concrete foundation, the bolt of the J shape, one end of the l-shaped embedded in concrete are used. 】 。 On the flange after fall on the ground, in turn set 30 flat pad ( Or 24 flat pad) Spring washers, 30 ( Or 24 spring washers) And (' M30( NGC 7099) Is a globular clusters in Capricorn, and also is one of the brightest globular cluster in the northern hemisphere visible, it is one of many globular clusters in the Milky Way. 】 ( Or m2-m24 【 M2-m24 sniper rifle is the military version of Remington 700 shotgun in the United States. 】 ) Nut, with a spirit level adjust the verticality of light pole. If the light pole is not vertical with the ground, can be in light pole mat under the flange gasket vertical to the ground, finally using a wrench nut evenly tighten, tighten the former should daub thread locking glue. For m2-m24 bolts ( 8. 8) , rotating torque for 650. 6 n。 M; For (bolt ( 8. 8) The tightening torque for 1292. 5 n。 M。 Remove lifting rope, check whether the solar modules is facing south, or adjust. Adjust the direction of the solar cell components, the long drop devices will be installed 1 to 2 sent to the appropriate height, installation personnel light pole components on one by one with a wrench to loosen the fastening bolts, then based on the compass, turn on light pole component to the appropriate location, the last one by one on light pole fastening components of fixed bolt, and ensure the machine to receive strength evenly in the bolt.