loading

We are a leading manufacturer of solar power utilization and lighting systems

Solar energy lamp solar lamp foundation engineering construction process and the note

Solar street lamps at the top of the step, the most important thing is to do root, like production house. No matter what you do, life is always the most important. Foundation is used in the fixed structure of the solar street lamps, but also have placement and protection effect of the battery. Because the

install solar street light is the most important step is to lay a solid foundation, like building a house. No matter what you do, base is always the most important. Base is used in the fixed structure of the solar street lamps, also has the place and protect the batteries. Because of various height and size of wind solar street lamps, solar street light have different intensity of root. In the process of construction, ensure the intensity of the roots and structure in accordance with the design requirements. According to the situation of the construction site, solar street lamps manufacturer has the responsibility to have challenged device location of irrationality, and will in the first case report to the relevant person in charge. Rectification must be finished within a time limit in accordance with the actual construction standards. Install solar street lamps roots cage process is as follows: 1. In strict accordance with the root the size of the excavation pit road (solar street lamps The construction scale is decided by construction personnel) ; 2. In the foundation, buried on the cage of the surface must be level ( Through the level measuring and testing) 。 Cage on the anchor bolt must be perpendicular to the upper surface (the root With square measuring and testing) ; 3. Place 1 -, after the completion of excavation 2 days to investigate whether there is leakage of groundwater. If there is leakage of groundwater, immediately suspend construction; 4. Ready before construction foundation the tools needed to solar street lamps, and select the construction experience of the construction personnel; 5. In strict accordance with the figure to choose the appropriate cement ground solar street lamps. For high soil ph, must use the special cement resistance to acid and alkali. Fine sand and stone must not contain any impurities that affect the concrete strength, such as soil. 6. It is necessary to real root cage surrounding soil pressure; 7. It is necessary to fill in 6 m light pole manufacturer box at the bottom of the drain, solar cell module is placed at the bottom or according to the appended drawings. 8. Before construction, must be sealed on both ends of threading pipe, prevent foreign body after construction or enter or congestion, make the device installed when threading difficult or impossible; 9. Basis after the completion of the solar street lamps, demand will keep 5 to 7 days ( According to climate conditions) ; 10. Solar street lamps can be connected in solar street light roots after installation. Above is the key and matters needing attention in the process of solar street light foundation construction. We must pay attention to these problems when laying the foundations. In this way, can ensure the global stability of the solar energy lamp posts.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
Leading the future of green energy storage, ALLTOP will appear at the 137th Canton Fair

Exhibition name: 2025 THE 137TH CHINA IMPORT AND EXPORT FAIRExhibition date: April 15-19, 2025Booth No. : 14.3 f33-34g10-11/14.2 D13-14-15Address: China Import and Export Fair Hall (Canton Fair Hall)
Somali municipal project: ALLTOP solar street lights light a green future
Project name: A municipal project (solar street lamp) in Somalia was successfully implemented
Date: January 04, 2025
Project location: Somalia
Quantity and specific configuration: 500 sets of 0278-400W solar street lights
ALLTOP presents innovative products at the 2024 Solar PV and Energy Storage World Expo
2024 Solar PV & Energy Storage World Expo The 16th Guangzhou Intt Solar Photovoltaic & Energy Storage Exhibition Booth No.Booth B551, Hall 10.2, Area B TIME/August 8th-10th, 2024 ADD: Area B, China Import & Export Fair Complex, Guangzhou
Pv + Agriculture: ALLTOP lights up Pakistani farms with green light, photovoltaic agricultural irrigation project is successful
While actively responding to the "Belt and Road" Initiative, ALLTOP should dig deep into overseas markets and carry out accurate market positioning and strategic planning. Comply with the current economic trend in the international situation, while ensuring that its products and services can meet the actual needs of countries along the "Belt and Road", and make ALLTOP unique products can achieve the purpose of truly serving the "Belt and Road", so as to achieve a soft landing and grounding; A pr
Shaping the Future of Energy ALLTOP at the Expo Georgia Exhibition Center
Live up to the old expectations! On April 26,The 28th International Exhibition for Buildi had its grand opening. ALLTOP team appeared in 118A, Hall 11.36, brought many new photovoltaic products, outdoor street lights, photovoltaic energy storage and other one-stop systematic solutions, attracted more than 300 industry leading enterprises to participate in the exhibition, many visitors have stopped to visit, exchange, tens of thousands of visitors, customers together, a glimpse of the annual indu
no data
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service
detect