Solar street lamp installation process and method you master? Solar street lamps factory today small make up the detailed explanation: 1, insulation test: with shaking table telemetry insulation resistance between line and ground, check whether the cable is in good condition, with or without leakage, all the test values
you master the installation process and methods of the solar street light? Today, solar street lamp manufacturers of small edit brought a detailed explanation: 1. Insulation test: use remote meter measuring insulation resistance between wire and ground, check whether the cable is in good condition, with and without leakage. All test values should comply with the specification requirements. After the completion of the telemetry, conductor should be discharge to the ground. Cable terminal used rubber seal, and then with duct tape. 2. The installation of solar street light: ( 1) Solar street lamp installation height (same position From the light source to the ground) , elevation and installation direction should be consistent. ( 2) Installation of lamps and lanterns of the longitudinal centerline and the longitudinal centerline of the arms should be consistent, the horizontal line of lamps and lanterns should be parallel to the ground, tighten the visual inspection shall not be skewed. ( 3) Lamp holder shall be fixed tightly. Should be according to design the adjustable holder to adjust to the right place. Socket connection should comply with the provisions, 4) All kinds of nuts should use washer and spring mattress tightened. 3, electric equipment installation: ( 1) Material must be after unpacking inspection to install and use. ( 2) Should match the centerline of the moving contact head and static contact, the contact should be close contact. ( 3) Secondary loop auxiliary switch switch contact should be accurate, reliable contact. ( 4) Mechanical locks and electronic locks should be accurate and reliable. ( 5) Grounding system must be solid and reliable, and conform to the requirements of the drawings and specifications. 4. Test and stress test: debugging equipment, instruments, meters must be approved by the national qualification check by the relevant units with measurement certificate, and the personnel use and care. ( 1) Circuit insulation testing must be qualified, impedance matching, correct wiring is correct, logo is complete. ( 2) Instruments shall be responsive, accurate measurement, zero is correct. Precision, change and record accuracy should comply with the specification requirements. ( 3) After the installation is complete, item by item, check and correct, and debugging. ( 4) Breakdown after completion of debugging, system debugging, linkage debugging and commissioning can be achieved. These are our introduction. If you want to know more information about solar street light, please pay attention to the site. We will provide professional solutions and services.