loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Solar controller

The use of the solar controller: ( 1) Use the M4 screws reliable support controller or flat surface. ( 2) After the connection lamp ( Note the polarity of the main light) , package with insulation belt joint connection. ( 3) Check the battery voltage. First, it should be



solar controller' Called the solar controller solar charge controller, is used for solar power generation system, the control of multiple solar cell phalanx of battery and battery for solar power inverter load automatic control equipment. 】 The method of use:

( 1) Use the M4 screws reliable support controller or flat surface.

( 2) After the connection lamp ( Note the polarity of the main light) , package with insulation belt joint connection.

( 3) Check the battery voltage. First of all, it should be the correct voltage controller, stop work voltage range is different. When the battery voltage is less than 10. 7 v, please recharge. As some connection batteries, digital tube ( Note the battery polarity) , if it is bright, this means that the battery connection are correct, if not, please in polarity connection, open the cable, and damage to the battery. After the connection of UPS, with insulation tape.

( 4) Check. The first thing to check is the voltage, the voltage regulator should apply to the solar panels Solar panels, 太阳能板) Is by absorbing sunlight, the solar radiation through the photoelectric effect or photochemical effect directly or indirectly converted into electrical energy device, the main material of most of the solar panel as the 'silicon', but because of the production cost is larger, so it widely used, we still have some limitations. 】 Stop work, voltage range is different. As solar panels shown in connection to the controller panel will bright lighting throughout the sun &; , if not, please check the polarity of the solar panels. )

( 5) The controller has two work modes: U” For lighting control mode, P” Compared to normal control mode, advocate the lamp work time setting options: 15 hours, 1 hour Once the short press SET” The key is equal to an hour.

the LED digital tube' Led digital tube ( 领导段显示) By multiple leds encapsulation together 'eight' word, lead has been done in the inside connection, only lead to their each stroke, public electrode. 】 Display the symbol meaning

& uuml; Lighting control mode, advocate the lamp to start the work after the sunset and sunrise or edit cut off timer.

N any meaning, banning the use of this model.

P normal control mode, and continue to advocate the lamp circuit power supply

0 U advocate the lamp, after the sun set, the morning after getting up close.

Ñ Pattern is pointless, banning the use of this model.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
You're Invited! Visit ALLTOP at Stand H1.10 – Solar & Storage Live Nigeria 2026

Event: Solar & Storage Live Nigeria 2026
Dates: July 14–15, 2026
ALLTOP Booth: Stand H1.10 (prime location – we look forward to seeing you there!)
Address: Landmark Centre, Lagos, Nigeria
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service