Six steps make rookie quickly master the LED display project budget

Engineering budget, can? Would not take the time to study, six steps control easily LED engineering budget carefully read the steps below.

a quantity - — Can know fairly well, and hence the

the first thing to ask engineering to project list, or according to the field, written by bill of quantities project of

if provided in the tender documents with bill of quantities, bidding price calculation before, want to check the quantity. Unless otherwise stipulated in the tender documents does not provide the bill of quantities, calculate according to the drawings of all quantities. Such as the tender documents have provisions on the detailed calculation method, should be in accordance with the relevant provisions of method to calculate.

only calculate accurate, accomplish know fairly well, to prepare, make sure that there is no mistake

step 2 determine the unit price, price calculation or

in tender offer, the calculation of each partial quantity later, just need to make sure that each partial unit price of the project, and according to the format of the fill in the bill of quantities quotation in the tender documents, is usually based on the partial content of quantities and the project name to fill in the unit price and price. To calculate the unit price, shall constitute a partial project all the costs are classified as one of them.

labor, materials, machinery fee should be according to the division of the sectional works of labor, materials, machinery consumption and its corresponding market prices.

in general, the contractor shall establish their own standard price database, and on the basis of calculating engineering bid price. In database application of the unit price for a specific project for tender offer, need to use the unit price of audit evaluation and adjustment, refers to accord with the actual situation of the bidding project, reflect the change of market prices.

at the different stages of the bidding price establishment, bidding price is generally in the form of a table to calculate.

step three determine the subcontract works cost

made from subcontracting costs is an important part of the bid price, sometimes the prime contractor is part of the bid price from subcontracting construction cost. In the preparation of bid price, therefore, need to have a check measure made the price, the price of the need to be familiar with the scope of the subcontract works, to evaluate the ability of the made.

step four calculation and repeated verification profits profit refers to the contractor of exceed the time limit, to determine the profit value goal is to consider can gain maximum profits, and to ensure that the bid price is competitive. Tender offer when the contractor shall be determined according to the market competition situation on the project's margins.

step 5 repeated review and measure the risk, and confirm the risk fee

risk fee is an open question to the contractor, if not all risks insured is expected, risk fee may be expected to have rest, this part of the surplus and profits together is the surplus; If the risk fee estimate shortage, the subsidies by earnings

when bidding should be based on the actual situation of the scale of the project and the project is located, by experienced professionals, item by item analysis was carried out on the possible risk factors after determine a reasonable expense ratio.

6) determine the bid price, and timely adjustment

according to the different modes of quotation, will get engineering after all expenses summary sum of tender offer, but this calculation of engineering bidding price is still not as bid price, because the calculated prices may repeat may also calculate leakage, may also be some estimates the cost of a deviation, etc. And therefore must be calculated project tender offer some necessary adjustments.

adjust the bid price shall be based on a project based on the analysis of profit and loss, profit and loss forecast application of a variety of methods from various angles, point out the problems in calculation, and take steps to reduce costs, increase profits, to determine the final bid price quotations.

coordinating editor YingZi

the LED screen mesh

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
Leading the future of green energy storage, ALLTOP will appear at the 137th Canton Fair

Exhibition name: 2025 THE 137TH CHINA IMPORT AND EXPORT FAIRExhibition date: April 15-19, 2025Booth No. : 14.3 f33-34g10-11/14.2 D13-14-15Address: China Import and Export Fair Hall (Canton Fair Hall)
Somali municipal project: ALLTOP solar street lights light a green future
Project name: A municipal project (solar street lamp) in Somalia was successfully implemented
Date: January 04, 2025
Project location: Somalia
Quantity and specific configuration: 500 sets of 0278-400W solar street lights
ALLTOP presents innovative products at the 2024 Solar PV and Energy Storage World Expo
2024 Solar PV & Energy Storage World Expo The 16th Guangzhou Intt Solar Photovoltaic & Energy Storage Exhibition Booth No.Booth B551, Hall 10.2, Area B TIME/August 8th-10th, 2024 ADD: Area B, China Import & Export Fair Complex, Guangzhou
Pv + Agriculture: ALLTOP lights up Pakistani farms with green light, photovoltaic agricultural irrigation project is successful
While actively responding to the "Belt and Road" Initiative, ALLTOP should dig deep into overseas markets and carry out accurate market positioning and strategic planning. Comply with the current economic trend in the international situation, while ensuring that its products and services can meet the actual needs of countries along the "Belt and Road", and make ALLTOP unique products can achieve the purpose of truly serving the "Belt and Road", so as to achieve a soft landing and grounding; A pr
Shaping the Future of Energy ALLTOP at the Expo Georgia Exhibition Center
Live up to the old expectations! On April 26,The 28th International Exhibition for Buildi had its grand opening. ALLTOP team appeared in 118A, Hall 11.36, brought many new photovoltaic products, outdoor street lights, photovoltaic energy storage and other one-stop systematic solutions, attracted more than 300 industry leading enterprises to participate in the exhibition, many visitors have stopped to visit, exchange, tens of thousands of visitors, customers together, a glimpse of the annual indu
no data
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service
detect