Since the leakage protector in batteries to get an electric shock protection solar led lights

Originally not to install street lamp leakage protector, partly because not go up; Second, determine the action current leakage protector is bad, if installed and can be no action. If the current action of setting body greater than the limit current under 30 ma, protect the invalid! Mount



is not to the original leakage protector' Leakage protector, referred to as 'leakage switch, also called leakage circuit breakers, leakage is mainly used in equipment failure, and to a potentially lethal person get an electric shock protection, overload and short circuit protection function, can be used to protect lines or motor overload and short circuit, can be in normal circumstances for the use of line not frequent conversion start. 】 And partly because not go up; Second, determine the action current leakage protector is bad, if installed and can be no action. If the current action of setting body greater than the limit current under 30 ma, protect the invalid! Mount is also useless, without any role; But if less than or equal to 30 ma, and because of street lamp line is longer, and it is open, the physical leakage situation will be more than 30 ma, and often lead to misoperation 【 Misoperation is refers to the power system in normal operation without abnormal failure for protection, or when the power system failure or abnormal situation after the protection of the brake, or in the event of a failure or abnormal situation but haven't reached the brake protect and brake the premise of protection, thus caused serious influence on power system. 】 ! So it's impossible to light lamps. Two phase power take its light, after weighing the pros and cons, not to install street lamp leakage protector.

electrical appliances, lamps and common contact even if don't do ground wire, lighting inside the joint leakage occurs between the light pole and there will be a significant number of imported the earth, so someone touch charged light pole, is the size of the leakage area and light pole of resistance between parallel resistance again, so even if a few hundred ma leakage, whereas the current through the body is very limited, in this case if selected 30 ma leakage protector is no work, because of more than 100 ma leakage protector can guarantee personal safety. You know, 30 ma leakage protector to prevent personal injury, ma - 100 300 ma used to prevent leakage protection electric lamp quotation gas fire prevention.

there is another reason is that street light cable generally is very long, so the wire to ground between large capacitance, sometimes can be more than zero JiWei method, it is can provide pathways for alternating current (ac), which made leakage protector misoperation. So now, the street light project most used in each of the light pole alone do grounding way, when the leakage is not serious not dangerous foreign; If leakage serious open will trip, also won't produce 'step' A step voltage, is refers to the electrical equipment grounding fault occurs, walking around the earthing electricity into the location potential distribution area, the voltage between the two feet. 】 ', so safety is guaranteed.

during the winter, the snow was falling, the greater the streets empty again, only the few lamp posts, where still stands, quietly it props up a stretch of the edges, for pedestrians on the street with a bright, with a little warm, silently waiting for you, never stop!

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service