The first step of installing solar street light, the most important thing is to do, like building a house. No matter what you do, the base is always the most important. Foundation is used in the fixed structure of the solar street lamps, and also have the effect of placement and protect the batteries. Because each
install solar street light is the first step to build the foundation, is like building a house. No matter what you do, base is always the most important. Foundation is used in the fixed structure of the solar street lamps, also have the effect of placement and protect the batteries. Because of various height and size of wind solar street lamps, solar street light with different basic strength. In the process of construction, to ensure the foundation strength and structure comply with the design requirements.
according to the situation of the construction site, solar street lamps manufacturer is responsible for the installation location of irrationality, and report to the relevant responsible persons in the first place. Rectification must be finished within a time limit in accordance with the actual construction standards. Based cage install solar street lamp installation steps are as follows: 1. In strict accordance with the size of the solar street light base excavation pit road ( The construction size is decided by construction personnel) ; 2. In the foundation, embedment of cage on the surface must be level ( Through the level measuring and testing) 。 Cage on the anchor bolt must be perpendicular to the base on the surface, With square measuring and testing) ; 3. After completion of the excavation, place 2 days, observe whether there is leakage of groundwater. If there is leakage of groundwater, to immediately stop the construction; 4. Before construction ready based the tools needed to make solar street lamps, and select the construction experience of the construction personnel; 5. In strict accordance with the figure to choose the appropriate cement ground solar street lamps. High ph value of soil must use special cement resistance to acid and alkali. Fine sand and stone may not contain the soil and other impurities that affect the concrete strength. 6. Basis must cage surrounding soil compaction. 7. Solar battery tank placed at the bottom of the tank must be filled in the basis of the drain or according to the appended drawings. 8. Before construction, threading pipe ends must be sealed to prevent foreign body after construction or enter or congestion, caused by threading difficulty when installation or not thread; 9. Basis after the completion of the solar street lamps, the need to maintain 5 ~ 7 days ( Depending on the weather) ; 10. After the basic experience through the solar street lamps, can install solar street light. Are these solar street light base construction steps and key points. We must pay attention to these problems when laying the foundations. Only in this way can ensure the overall stability of the solar energy lamp posts.