Monitoring stem what to need to be fixed? 2020 - 03 - 09 hits: 279 now more and more places in the installed monitoring stem, in order to ensure the quality, monitoring pole on the control rod installation requirements in the face of his attention to understand, let's talk about monitoring stem what,
monitoring stem what to need to be fixed?
2020- 03 - 09 hits: 279
now more and more places in the installed monitoring stem, in order to ensure the quality, monitoring pole on the control rod installation requirements in the face of his attention to understand, let's talk about what is monitoring rod installation requirement. 1, to install monitoring location of reinforcement, due to the control rod used for a long time, so be sure to the horizontal plane fixed work, before for the installation, be sure to observe whether there is a bubble, middle after installation, good will must be digging hole wall, avoid all stuff in. 2, at the time of actual construction, must be in the hole dug, in and around the bottom of plastic, the soil and monitor rod. Avoid some debris impact from the soil to monitor the use time of rod. 3, is the control rod is the metal inside, be sure to do when actual construction monitoring of ground work, let the control rod is combined with land.