loading

We are a leading manufacturer of solar power utilization and lighting systems

Rooftop photovoltaic power station users how to fire?

'One,' dc arc fault. The service life of the household photovoltaic system, theory - in 20 years 25 years, but with the increase of fixed number of year of the photovoltaic power plant put into operation, the inverter electronic components will be aging, cable breakdown, such problems as loose contact, these are

in the first place, to prevent 'DC arc fault'. Domestic photovoltaic system theory for 20 - service life 25 years. However, with the increase of operating life of photovoltaic power station, inverter in the electronic components will be aging, cable fault, the problem such as poor contact. The internal cause of these systems can lead to arc fault. Usually, most of the installation of the pv array using long series high voltage DC power supply, indirectly increased the arc related safety issues. So how to prevent this problem? First of all, from the photovoltaic equipment, select the high reliability and good industry reputation photovoltaic (pv) grid inverter. Secondly, from the Angle of construction, photovoltaic system design should be strictly enforce national standards, design specifications, to ensure construction quality. If construction quality guaranteed, crack appeared in the course of engineering components and wiring bad problems can be reduced to some extent, these problems particularly high probability in engineering. In addition, the lightning protection and grounding system shall be prepared, in order to prevent the induction lightning damage to the equipment. Second, the cable fire prevention measures. Have been to the scene of the pv project people will always be attracted to the cable, because there is no one or two cables, too much! From the elements to the inverter has many connections, they are widely distributed. Although cable should have a good fire protection, but in the actual process often appears irregular cable wiring. Once the cable is on fire, would be devastating, did not have a good remedy. At present, each cable can't be in the site of the project location equipment installation. In order to prevent hidden danger, refractory isolation and flame retardant cable in cable trench is usually used as the main measures of dealing with the cable fire. In the grooves and centered in the installation of cable slot box, grade C or above should be selected for the flame retardant cable. In addition, the partition of the pipe and cable should be through the roof power station and the holes and cracks on the floor with flame retardant materials or non-combustible material tight seal, in order to prevent cable fire after each other to spread. Third, the protection should be done before it happens. Efforts should be from transport and maintenance. Many users have a misconception that photovoltaic system is completed, it doesn't matter! Very few people go to regular inspection and maintenance. Earlier, some users still use photovoltaic modules drying vegetables, this really let a person feel anxiety. They do not only operation and maintenance, but also 'fuel', this is really hard to describe. For the user, the regular maintenance of power station is very important. First of all, it is necessary to check the photovoltaic equipment for disease, extended service or overload operation. When necessary, wear insulated shoes, a low-voltage insulating gloves, use insulated tools. After the completion of the work, should eliminate the potential accident in the system. Second, the students to form good habit of regular cleaning parts, to ensure that the parts surface is clean, no bird droppings and leaves. Finally, should be prepared to safety during inspection. All should disconnect switch should be disconnected, to ensure the completely discharge the capacitor and inductor.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Smart Lighting: Every Beam Illuminates Your Ideal Life
In horticulture, each day brings new challenges. Unpredictable weather, fluctuating light conditions, and rising energy costs make it difficult to ensure consistent crop quality and yield. But what if growers no longer had to leave success to chance? At ALLTOP, we believe light should work for you, not against you. With nearly 16 years of experience, we develop intelligent LED lighting solutions that empower growers to optimize every aspect of plant growth—helping you Control Your Perfect Day.
Fifteen Years of Good Deeds: ALLTOP Donates Another 230,000 to Expand Schools and Revitalize Henglan
On the evening of December 3rd, the 2025 Henglan Town Charity Walk Appreciation Gala concluded warmly. At this grand event themed "Expanding Schools and Revitalizing Henglan," Guangdong ALLTOP Lighting Co., Ltd. pledged an on-site donation of 230,000 RMB, interpreting the "Spirit of Fraternity" through action and contributing to the development of local education.
Congratulations on the Successful Launch of Guangdong ALLTOP Industrial Park!

The Guangdong ALLTOP Campus, spanning 50.24 mu with a 168,000 sqm built-up area, represents a 370 million RMB investment. It is projected to generate an annual output value of over 600 million RMB at full operation. Featuring advanced smart production lines and digital management systems, its core mission is to become a modern base for intelligent manufacturing.
CCTV Authority Spotlight: Alltop's Innovative Energy Storage Products Shine at Canton Fair

CCTV featured Alltop's innovative energy storage products at the Canton Fair, highlighting the company's technological strength and market leadership. The brand drew significant attention and orders at the event, with its booth attracting global visitors and showcasing advanced renewable energy solutions. The coverage underscored Alltop's expertise in energy storage systems and smart solar lighting, earning national recognition for its innovation.
Invitation | From October 15th to 19th, ALLTOP invites you to attend the 138th Canton Fair together!

The 138th China Import and Export Fair

Date: Oct. 15th-19th, 2025

Booth No.:14.3F33-34G10-11

Add: China Import and Export Fair Complex (Canton Fair Complex)
Global Witness, Technological Breakthrough! ALLTOP Showcases Comprehensive Solutions at Solar PV & Energy Storage World Expo

Solar PV & Energy Storage World Expo

The 17th Guangzhou Intl Solar Photovoltaic & Energy Storage Exhibition

th No.:10.2 B551

Date: 8th-10th, August 2025

ADD: Area B, China Import & Export Fair Complex, Guangzhou
Leading the future of green energy storage, ALLTOP will appear at the 137th Canton Fair

Exhibition name: 2025 THE 137TH CHINA IMPORT AND EXPORT FAIRExhibition date: April 15-19, 2025Booth No. : 14.3 f33-34g10-11/14.2 D13-14-15Address: China Import and Export Fair Hall (Canton Fair Hall)
Somali municipal project: ALLTOP solar street lights light a green future
Project name: A municipal project (solar street lamp) in Somalia was successfully implemented
Date: January 04, 2025
Project location: Somalia
Quantity and specific configuration: 500 sets of 0278-400W solar street lights
no data
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service
detect