A) Daylighting kept clean, if dust or other dirt, wash first, then the water gently wipe with a clean gauze; Avoid by all means is wiped with hard objects or corrosive solvent flushing; Photovoltaic cell components when cleaning
( a) Solar energy battery components maintenance 1. Keep the lighting surface clean. If there is a dust or other dirt, wash first, and then with a clean gauze to gently dry the water mark. Avoid using hard to wipe or corrosive solvent washing. Clean photovoltaic battery module, should be before the sun rises in the morning. 2. Solar energy battery components junction box should be checked regularly, in order to avoid weathering, battery components encapsulation and connector should be inspected once every quarter. If any does kaifeng, glue and water, battery discoloration, loose connection, disconnection, the phenomenon such as corrosion, should be timely treatment. ( 2) Inverter maintenance 1. Check the connection of inverter is rigid, insulation performance of the circuit is normal, is damaged. Particularly want to check the fan is normal operation of the converter. 2. Inverter alarm stop not immediately after the launch. Check carefully whether the fault reason and equipment damage, power supply module if there is a fault and cracking phenomenon. Find out why, after can restart. If you are not sure about the start again, you should ask the maintenance center, operation maintenance station or the local power station report. ( 3) Other condition 1. If the trip because of rain, the likelihood is the terminal is not tight. In this case, must be in after a storm comes a calm post-processing. Insulating tape can be used to package terminals, and then see if tripping. If tripping continue, should report service center or the local power station. 2. In thunderstorm weather, air body under the ammeter switch should be closed, in order to prevent damage of electrical equipment. Thunderstorm, then turn on the switch. Poverty is the primary responsibility of the operation and maintenance of photovoltaic power station? 1. Operation and maintenance duties: operation maintenance center should have specialized offices, equipped with full-time operation maintenance personnel, 24 hours on duty, to set up dedicated operation maintenance call, ensure 24 hours running smoothly, and for release to the county-wide photovoltaic installation personnel. Maintenance call acceptance shall have complete records. Ready to operation and maintenance of sufficient materials. 2. Township operation maintenance station duties: set up a maintenance call, more than accept the villages and towns of the maintenance of the photovoltaic power station. General malfunction should be dealt with at the scene of the 4 hours, cannot handle shall be timely report operation maintenance center processing, and processed within 24 hours. Participate in the fault liability cognizance; Establish the operation and maintenance of files; Ready to operation and maintenance of sufficient materials. 3. Every year to village village operation maintenance personnel responsibilities: photovoltaic power station 4 times; Got a call from the pv of maintenance in the village, they must be present within 4 hours to check out and is responsible for the failure.