loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Popularize knowledge of the installation of solar photovoltaic power station for you

Generally in our country now the state is cement tile glazed tile roof of flat or small watts, the roof conditions generally can be installed, installed area mainly according to the roof is flat roof or inclined roof. Flat roof installed on the ceiling for

in general, our country the present condition of roof is cement tile, glazed tile, flat roof or small tile. Usually these roof conditions can be installed. The installation area depends primarily on the roof is flat roof or inclined roof. Flat top loader flat roof is named because the roof is flat, so when installing a photovoltaic system, there are a lot of the design requirements. First of all, should consider the local light, components should receive as much sunlight. Second, the front and rear parts of shielding should be considered. In order to get better light, should the tilt Angle of photovoltaic arrays and partial size to 0 degrees. If the array has a Angle, area of the natural will be very big, so the photovoltaic system flat roof installation of roof area. In general, the roof of the 1 kw system covers an area of 15 20 square meters. If the user wants to install 5 kw photovoltaic system, the roof of the area is about 75 - he needs 100 square meters. Sloping roofs usually, inclined roof installation of photovoltaic power generation system, facing the south. Roof is supported by bracket and photovoltaic module is fixed on the bracket. In general, occupy the 7-1 kw system The roof of 15 square meters area. If the user wants to install 5 kw photovoltaic system, the roof area of about 35 - required 75 square meters.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service