On south-facing roof installation of photovoltaic power station for photovoltaic power generation investment items

1, the available area first determines how many available roof area, because the available area directly determines the installed capacity of the pv system. Generally speaking, the cottage roof 10 square can install 1 kw photovoltaic power station, 10 square can install 1 tile roof installation.

1。 Available area is first of all, determine how many usable roof area, because the available area determine photovoltaic system capacity. In general, 1 kw photovoltaic power station can be installed in the bungalow on the roof of 10 square metre, about 1. 3 kw can be installed in 10 square meters of the tile roof, required to pass through professional design. Among them, the average daily 1 kw power of about 4 degrees ( The northwest region as much as 5 ~ 7 degrees) 。 2. Installed capacity installed capacity is closely related to the grid connection and roof area. If the user to use more power, and want to install a larger capacity, they need a bigger roof area and a 'spontaneous self-use and remaining power grid connection mode. Installed capacity, of course, also related to the investment amount. The user can install the proper capacity according to their plan. 3. Occluded objects hide the impact on the solar photovoltaic power generation system is critical, including the structure of the shade and tall trees around the building block. Shielding can cause hot effect of solar panels, which not only affects the overall power generation, still can cause fatal damage to the panels. 4. Waterproof roof waterproof condition depends on whether there is a very good waterproof layer. If building without a good waterproof system, it may not be able to meet the use function of roof in its life cycle. 5. The basic requirement of roofing waterproof anti-corrosion must first determine whether the type of metal roof can be installed. Corrosion protection is to pay attention to the anti-corrosion effect of anticorrosion coating of metal roofing. 6. Bearing photovoltaic power plants should be built on the roof. If the roof bearing capacity can't meet the requirements of photovoltaic building, construction of the project will not be.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
Leading the future of green energy storage, ALLTOP will appear at the 137th Canton Fair

Exhibition name: 2025 THE 137TH CHINA IMPORT AND EXPORT FAIRExhibition date: April 15-19, 2025Booth No. : 14.3 f33-34g10-11/14.2 D13-14-15Address: China Import and Export Fair Hall (Canton Fair Hall)
Somali municipal project: ALLTOP solar street lights light a green future
Project name: A municipal project (solar street lamp) in Somalia was successfully implemented
Date: January 04, 2025
Project location: Somalia
Quantity and specific configuration: 500 sets of 0278-400W solar street lights
ALLTOP presents innovative products at the 2024 Solar PV and Energy Storage World Expo
2024 Solar PV & Energy Storage World Expo The 16th Guangzhou Intt Solar Photovoltaic & Energy Storage Exhibition Booth No.Booth B551, Hall 10.2, Area B TIME/August 8th-10th, 2024 ADD: Area B, China Import & Export Fair Complex, Guangzhou
Pv + Agriculture: ALLTOP lights up Pakistani farms with green light, photovoltaic agricultural irrigation project is successful
While actively responding to the "Belt and Road" Initiative, ALLTOP should dig deep into overseas markets and carry out accurate market positioning and strategic planning. Comply with the current economic trend in the international situation, while ensuring that its products and services can meet the actual needs of countries along the "Belt and Road", and make ALLTOP unique products can achieve the purpose of truly serving the "Belt and Road", so as to achieve a soft landing and grounding; A pr
Shaping the Future of Energy ALLTOP at the Expo Georgia Exhibition Center
Live up to the old expectations! On April 26,The 28th International Exhibition for Buildi had its grand opening. ALLTOP team appeared in 118A, Hall 11.36, brought many new photovoltaic products, outdoor street lights, photovoltaic energy storage and other one-stop systematic solutions, attracted more than 300 industry leading enterprises to participate in the exhibition, many visitors have stopped to visit, exchange, tens of thousands of visitors, customers together, a glimpse of the annual indu
no data
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service
detect