loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Norway's 2018 new pv installations up 29% from a year earlier

5 mw, rose 29% year-on-year. By the end of December, Norway cumulative pv installed capacity of about 68 mw. Compared with other European markets, Norway's newly installed pv installed capacity is not much, but compared with itself, photovoltaic installations in 2018 at a record high.

according to statistics released Multiconsult, by the end of December 2018, Norway cumulative pv installed capacity of 68 mw. 2 mw, rose 29% year-on-year. The new pv installations for 11, 2016 megawatts, but in that year, the market - the highest annual growth rate of 366%.

the relevant personnel said that the chief reason for the increase comes from, the gradual decline in electricity prices rising cost of pv system installation, and people begin to have more attention on solar energy. “ More and more companies are solar energy into their portfolio. In this way, the solar energy with water and electricity and district heating become more integrated part of the energy structure. “

Norway is through & other; +客户” Plans to support the roof solar energy, the plan calls for utilities to buy power from photovoltaic system operator.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service