loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Non-standard to teach you how to install outdoor solar led street lamps garden lights

As far as I know in real life, some T personnel of TN - electric S garden light earthing in the system of not understanding problems and requirements, in the actual construction, the easy view a Zhai problem. Now let me for you to solve, the focus is shown as: TN - S system of heavy



as far as I know in real life, some T personnel of TN - electric S garden light earthing in the system of not understanding problems and requirements, in the actual construction, the easy view a Zhai problem. Now let me for you to solve, the focus is shown as: TN - S system of repeat grounding problem of N line in repeat grounding, repeat grounding formulation is clear or PE. For TN - S system, the repetition of the PE line repeat grounding is grounded, analysis is as follows.  

  1, such as not to repeat grounding when PE bolt system is in neither meet zero or ground state of unprotected. And when to repeat grounding, when the normal PE system in the protection by zero state; When PE bolt, if break in repeated earthing system of the side is a state of grounding protection. The repeat grounding TN - - S system with dual protection function, namely the PE by TN - after disconnection S into TT system protection mode ( PE wire break in the repeat grounding) of the side 。

    2, PE line repeated earthing can reduce when short circuit phase line to touch the shell of the equipment enclosure of the voltage, phase line to touch the shell, shell to ground voltage is equal to the fault point P and the voltage between the transformer neutral point. Assumption that line and PE line specifications, equipment shell of Pao voltage is 110 v. And PE line from the fault point P, after repeated earthing PE line impedance and repeat grounding resistance RF: with butyl grounding resistance after RA series resistor in parallel. In general, as a result of repeated earthing resistance RF with work after grounding resistance R series resistance is greater than the line impedance of PE, so from P to the equivalent impedance transformer neutral point is still close to from P to the impedance of the transformer neutral point of PE line itself. If the phase line and PE line specifications are consistent, the P between transformer neutral point voltage UP is still about 110 v, while the equipment enclosure of voltage UP is only between the fault point P and the transformer neutral point voltage UP part of it.

    3, break with the short circuit occurs when the phase line, PE line potential rise due to the existence of the fault current, when the break point between the earth resistance is small, the potential of PE line is likely to be far beyond the safety voltage. The dangerous voltage along the line to PE equipment shell endanger personal safety. And because after repeated grounding, repeat grounding resistance grounding resistance in parallel with the power T after the equivalent resistance of grounding resistance is less than the power ding, makes the phase line break is located in the grounded resistance share increasing voltage so as to effectively reduce the PE line of voltage, reduce the electric shock risk.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service