Ningxiang problems that should be paid attention to install solar street light

A, foundation pouring 1, determine the floorlamp position; Exploration and geological environment, if the soft soil 1 m 2 are the surface, so the excavation depth should be deepened; Want to make sure there's no other way under excavation position (at the same time Such as cable, pipes, etc. ) , street lamp shade between the top without ever survive objects

a, basic casting

1, determine the position of the vertical light; In exploration geology environment, if the surface is 1. 2 meters, the soft soil, should deepen the excavation depth. At the same time, we should confirm there is no other way, Such as cables and pipelines, etc. ) At the bottom of the location, and no permanent shelter object street lamp at the top, otherwise should be appropriate to change position. The position of lamps and lanterns to set aside (2, in the vertical direction The excavation) Conform to the size of the hole ( According to the height of lamp post planning depth) ; Embedded parts will be held in the positioning of the casting. Embedded parts set in the center of the square hole, one end of the PVC pipes is set in the middle of the embedded parts, the other end of the set in the place of battery. Pay attention to the embedded parts and foundation and ground connection in the same horizontal plane ( Or screw at the top and the original ground in the same horizontal plane, depending on the needs of the garden) 。 One side should be parallel to the sidewalk. In this way, can guarantee the lamp is vertical, not skewed. , then pouring C20 concrete pouring process shall not stop vibrating rod, to ensure the density of population and robustness. 3. After completion of construction, clear in time positioning plate of residual sludge, using waste oil flush bolt impurities ( Bolt location with tape before construction, attach too many magazines, placed progress) 。 4, concrete condensation process, the water conservation regularly; Only when the concrete completely condensation ( Usually more than 72 hours) When to install droplight. two The placement of lamps and lanterns of 1. Hold each parts: solar panels are firmly fixed on the solar panel bracket, the lamp holder firmly fixed in the arm, then stent and grasp arm firmly fixed in the main stem, the connector to control box ( A battery pack) 。 2. Lamp before ascension, check whether the parts fasteners, lamp holder installed correctly, the light source is normal. Then debugging system, look at the situation is normal. Loosen the controller and solar panels on the line light source. Connect the solar panels cable and turn off the lights. At the same time, carefully observe the controller light changes. Before ascension and placed a complete equipment is normal. 3, the main light pole hoisting, pay attention to the quiet police; Fully tighten the screw. If the component is a problem with the asahi Angle, it is necessary to adjust the Angle of the asahi, so that it is completely facing south. 4. Put battery into the battery box, according to the skill will be connected to the controller. First connect the battery, and then connect the load, and then connect the solar panels. In the process of wiring operation, it is important to note that the controller of all wiring and terminals can't tag on connection error, the positive and negative polarity not conflict, can't reverse connection. Otherwise, the controller will be destroyed. 5, debugging system normal thing; Loosen the controller of solar panels on the wire, the light will light up. At the same time, connecting solar panels cable and turn off the lights. Look carefully on the controller lights change. Completely belongs to the normal, can seal control box. Three, place 1 battery. Put in the tank, as when the battery must be handled with care, prevent water tank must be smashed by the police. 2. After the output wire is connected to the battery, should avoid short circuit and damage battery in any environment. 3. Battery output lines connected to the controller on the telegraph pole, must solve the problem of polyvinyl chloride (PVC) threading pipe. 4, after the completion of the above, check the controller end connection, the police a short circuit. After normal operation, the door is closed control.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
Leading the future of green energy storage, ALLTOP will appear at the 137th Canton Fair

Exhibition name: 2025 THE 137TH CHINA IMPORT AND EXPORT FAIRExhibition date: April 15-19, 2025Booth No. : 14.3 f33-34g10-11/14.2 D13-14-15Address: China Import and Export Fair Hall (Canton Fair Hall)
Somali municipal project: ALLTOP solar street lights light a green future
Project name: A municipal project (solar street lamp) in Somalia was successfully implemented
Date: January 04, 2025
Project location: Somalia
Quantity and specific configuration: 500 sets of 0278-400W solar street lights
ALLTOP presents innovative products at the 2024 Solar PV and Energy Storage World Expo
2024 Solar PV & Energy Storage World Expo The 16th Guangzhou Intt Solar Photovoltaic & Energy Storage Exhibition Booth No.Booth B551, Hall 10.2, Area B TIME/August 8th-10th, 2024 ADD: Area B, China Import & Export Fair Complex, Guangzhou
Pv + Agriculture: ALLTOP lights up Pakistani farms with green light, photovoltaic agricultural irrigation project is successful
While actively responding to the "Belt and Road" Initiative, ALLTOP should dig deep into overseas markets and carry out accurate market positioning and strategic planning. Comply with the current economic trend in the international situation, while ensuring that its products and services can meet the actual needs of countries along the "Belt and Road", and make ALLTOP unique products can achieve the purpose of truly serving the "Belt and Road", so as to achieve a soft landing and grounding; A pr
Shaping the Future of Energy ALLTOP at the Expo Georgia Exhibition Center
Live up to the old expectations! On April 26,The 28th International Exhibition for Buildi had its grand opening. ALLTOP team appeared in 118A, Hall 11.36, brought many new photovoltaic products, outdoor street lights, photovoltaic energy storage and other one-stop systematic solutions, attracted more than 300 industry leading enterprises to participate in the exhibition, many visitors have stopped to visit, exchange, tens of thousands of visitors, customers together, a glimpse of the annual indu
no data
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service
detect