Monitoring stem base installation introduction - 2020 10 - 27 hits: 146 district control rod cement base usually length according to the room to the orientation of the floor or down light, regular or irregular two ways can be used. Rows embedded parts rules laid: community
monitoring stem base installation introduction
- 2020 10 - 27 hits: 146
district control rod cement base usually according to the room to the orientation of floor length or down light, regular or irregular two ways can be used. The rows: embedded parts rules laid plot monitoring for the same length specifications, the visual are arranged with rules, relative loss is larger; Irregular linings: adaptation has auxiliary shop floor installation, monitoring pole length is not restricted, loss is smaller. Community monitoring in construction of rod in embedded pipe mouth sealed with plastic or other materials in advance, in order to prevent the monitoring rod cast concrete when leakage into the embedded pipe, blockage caused by embedded pipe; Cast foundation, foundation surface must be higher than the ground plane 5 mm to 10 mm; Concrete must be maintained for a period of time, to ensure that the installation of the concrete can achieve a certain strength. Community monitoring pole in cement based on need and auxiliary floor ( A multilayer or joinery board) , each a multilayer or joinery board should be evenly divided into four, fixed on the rows, and keep 3 - 5 mm gap. And to walk normally check whether there is a 'squeak' sound. Plot monitoring pole, laid moistureproof isolation membrane, to delay the hygroscopic and expansion of the floor in the short term.