【 Mark pole installation method 】 (1) all traffic signs of component quality shipped to the site shall comply with the relevant technical standards, and by the supervision engineer for approval before use; (2) after arrived at the scene, make full use of the sign, road safety facilities such as column, manage pedestrians and
【 Mark pole installation method 】 (1) all traffic signs of component quality shipped to the site shall comply with the relevant technical standards, and by the supervision engineer for approval before use; (2) after arrived at the scene, make full use of the mark, road bar manage pedestrians and traffic safety facilities and construction in strict accordance with the operating rules, to ensure the safety of pedestrians and operators, as far as possible to prevent accidents, ensure the construction safety; (3) strictly in accordance with the requirements of the construction drawings and according to the direction of traffic flow measurement mark set position; (4) basis after the location of the size of the according to the regulations of the design was conducted in the appointed place of foundation excavation, and processed by the regulation after the template, reinforcing bar, pouring concrete, anchor bolt 【 Mechanical components are installed on the concrete foundation, the bolt of the J shape, one end of the l-shaped embedded in concrete are used. 】 And the base flange position correctly and to gauge the Shanghai solar energy street light [ Solar street light is a crystalline silicon solar battery power supply, valve control type sealed and maintenance-free battery ( Gel battery) Store electricity, super bright LED as light source, lamps and lanterns and controlled by the intelligent charging and discharging controller, is used to instead of the traditional public power lighting lamps. 】 Scaling is high; (5) sign supporting structure construction should be in the foundation, which has met the requirement of the strength of concrete and after approved by the supervision engineer. Pillar of the flange and the concrete foundation of the base flange should be level, closed, the anchor bolt, screw down the bolt after pillar not tilt; 6 by sliding bolt connecting fittings, embrace hoop will mark plate fixed on the pillar; Column type logo sign board of distance from the edge of the shoulder should guarantee 20 cm, edge of single-column signs should guarantee 250 cm above the road surface, cantilever installation clearance shall ensure that from the road 5. 2米; 7 sign board after the installation, should sign board of verticality, height, such as inspection, adjustment, to meet the requirements; Mark end cantilever installation of vertical layout should be in the road centerline, roadside sign pillar installation, logo layout should as far as possible or at an Angle perpendicular to the road line: directions and warning signs of 0 ~ 10 degrees, ban and indication of 0 ~ 45 degrees, the line of sight inducing sign of 80 ~ 90 degrees; Pet-name ruby sign board after the installation, all the sign board for cleaning, keep the space clean.