loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Lithium battery solar street lamp installation specification

A,

solar panels and solar panel installation standard plate bracket installation together, four screws should be tightened, note towards solar panels on the back of the junction box should not up. ( Note: in the process of the vertical rod solar panel toward the south, should pay attention to avoid the installation under a tree near or have other obstructions)

2, LED lamps and lanterns installation standard LED lamps and lanterns and light pole arm before installation, the lamps and lanterns with cable through the first light pole arm, on the top of the light pole, then the LED lamps and lanterns is installed on the light pole arm, screw fastening, lamp light source should be parallel to the flange, the installation to ensure that the light pole stand part parallel to the ground after the LED lamp light source, to achieve better lighting effect.

3, lithium electric smart store all-in-one control installation specification

lithium electric smart store all-in-one control with plate bracket installation, four screws should be tightened, note the lithium electric outlet position towards intelligent storage control machine should not be upward.

4, lithium battery of solar street light wiring methods

1, connect the LED lamp holder first cable; Note: red cable connect red cable, black black wire cable, 12 v system is negative.

2, open the system switch ( The system light is lit up) The LED lamp lights up.

3, again connecting solar photovoltaic panels cable, LED lamp holder. Note: red cable connect red cable, black black wire cable, 12 v system is negative.

4, the installation is complete.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service