loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

lighting up homes in remote villages

MANGALORE, FEB. 11.
About four years ago, Valerian Sequera, 48, came from Laila village in Belthangady taluk, and dakshina Kannada did not think that one day he could have a TV and watch the show at home by using solar energy.
He also did not know that the emergency light would replace the chimney light in the village.
Dayanand Salian from the same village also stopped using chimney lights in his house.
Visitors to the village in the evening may see the house connected by electricity.
But it\'s not because the house has a solar lighting system.
In 81 villages in Belthangady taluk, up to 2,200 houses have now adopted solar lighting systems.
Up to 600 houses in about 40 villages in Karkala taluk, Udupi district have also chosen the new system.
Two silent revolutions of taluks have been going on since the 1999 s.
In platter Taruk, in Dakhina Cummings, 200 houses used solar lighting last year.
This is due to the efforts made by the Solar Kshetra Dharmasthala Rural Development Project, Solar energy International subsidiary Solar Electric Light Corporation and the joint government.
Perhaps these taluks have the state\'s largest solar home lighting system.
The management and field staff of the rural development project are working to transform these villages into \"solar villages \".
The Charmadi area is part of the Western gaozhishan vein, where 10 poles are needed to draw 1 km long wires.
The installation cost of the pole is about Rs.
10,000, half of the unit cost of solar home lighting systems.
According to L. , executive director of the rural development project, some of the houses in these areas and in the remote areas of Belthangady taluk are now using solar lighting systemsH. Manjunath.
SubsidyHe told Hinduism the cost of installing a solar lighting system (one unit)was Rs. 20,000.
In this regard, the non-foreign ministry
Traditional energy provided
5,500 as a subsidy to the beneficiary.
The solar electric company, which acts as an installation agency, also offers discounts on Rs.
2,000 each.
Thus, a family benefits.
7,500, if solar lighting system is selected.
At the same time, loans were provided for rural development projects.
12,500 as a loan to the beneficiary under the microfinance program \"Pragathi nidhi\" at low interest rates.
However, beneficiaries can also lend to nationalized cooperative banks.
Rural development project Credit links beneficiaries with these banks, he said. Dr.
Manjunath said solar electric paid the excess if the loan interest exceeded 5 cents.
Each house with a solar lighting system has four solar lights.
The technology adopted ensures that only light is absorbed without heat, because the photovoltaic cells in the unit absorb light and convert it into electric energy.
Technical support it is said that solar electric has set up an office in Belthangady to deal with technical issues (if any ).
A solar unit can light up to four lights.
Each light can be lit for five hours a day. Mr.
Sequera says he uses each lamp between 6 p. m. and 10 p. m. every day.
During the rainy season, he can also use lights for about four hours a day.
He claims that he has had no problems using these lights for the last four years. However, Mr.
During the rainy season, Salian says, a lamp can be lit for about three hours a day.
Otherwise, each light can be lit for more than four hours a day.
Three institutions and banks have been pushing Rs since 1999. 5.
The cost of installing the lighting system in the beneficiary.
Solar lighting systems have become a reliable power option for villages in these two regions.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service