I believe you are no stranger to road LED street lamp, it can be seen everywhere, is also one of the LED products at the same time, inherited the LED energy conservation and environmental protection and the advantage of high brightness, by the people of all ages, be street lamp manufacturers vigorously applies in the middle of the road lighting construction project now. But it has to strictly according to the steps in the installation sequence for installation, and should pay attention to some matters, to ensure the normal operation of the LED street lamp. Small make up next is simple for you about LED street lamp installation steps and matters needing attention.
one, LED street lamp installation steps and matters needing attention
. Select installation location
to choose the appropriate installation position, easy to lay a solid foundation and install the lamp posts. Be careful not to choose the wet place, prevent light pole is not stable.
. Wiring ( Laying of buried cables)
according to engineering requirement, choose the right type of cable, cable, as well as the cable insulation test, ensure that all the test values conform to the requirements of the specification, and wear the cable in the waterproof nylon tube.
. Digging holes
according to the size of the embedded parts, the right size of the hole, in order to casting.
. Casting
will be embedded into the pit, to pouring concrete. Attention should be paid to stable and embedded parts in the process of casting, guarantee the embedded part straight.
. Fixed the LED street lamp based after dried,
wait will be assembled LED street light the bottom flange fixed with embedded parts, and screw down the screws.
. Connection to the light pole
the wire into the laying of cables, wrapped in adhesive joints, joint will prevent light pole.
the final the following points during the installation process also need attention:
( ) With the location of the LED street lamp installation height ( From the light source to the ground) , elevation Angle and lighting direction should be consistent.
( ) Longitudinal center line of LED lamps and lanterns is installed and longitudinal center line of lamp arm should be consistent, lamps and lanterns of lateral horizontal line should be parallel to the ground, after fastening visual should not have skewed.
( ) LED street lamp head should adjust to the correct position, according to the design lamp head wiring should conform to the rules.
( ) All kinds of nut again check and tighten, appropriate add washer and spring washer.
that is LED street lamp installation steps and matters needing attention, we are in strict accordance with the above steps and requirements for installation, after installation, but also many times for the LED street lamp debugging, to ensure the normal and stable light.